Laserfiche WebLink
25. If the rim elevation of the upstream public sanitary sewer is at an elevation higher <br /> than the lowest portion of the building pad, a back-flow prevention device (check <br /> valve) shall be installed on the lateral between the house and public sanitary sewer <br /> line. <br /> <br />26. Portable toilets used during construction shall be kept as far as possible from <br /> existing residences and shall be emptied on a regular basis as necessary to prevent <br /> odor. <br /> <br />27. The applicant shall submit a pad elevation certification prepared by a licensed land <br /> surveyor or registered civil engineer, to the Chief Building Official and Planning <br /> Director, certifying that the pad and building locations are per approved plans, <br /> prior to receiving a foundation inspection for the structure. <br /> <br />28. Dust and mud shall be contained within the boundaries of the property during <br /> times of construction. <br /> <br />FIRE AND POLICE: <br /> <br />29. The home shall be constructed with Class A fire retardant roofing material to the <br /> satisfaction of the Fire Marshall. The applicant is responsible for the relocation of <br /> the emergency vehicle access gate to the satisfaction of the Fire'Marshall. The <br /> gate shall be installed to the satisfaction of the Fire Marshall prior to occupancy. <br /> <br />30. The home shall be equipped with an automatic residential fire suppression system <br /> if required by the Fire Marshall. <br /> <br />31. All site improvements and house construction activities shall be limited to the <br /> hours of 8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction <br /> equipment must meet DMV noise standards and shall be equipped with muffling <br /> devices. <br /> <br />32. At no time shall campers, trailers, motor homes, or any other vehicle be used as <br /> living or sleeping quarters on the construction site. All such vehicles shall be <br /> removed from the site at the end of each work day. <br /> <br />33. The site shall be kept free of fire hazards from the start of construction to final <br /> inspection. <br /> <br />AP-98-02 (PUD-90-19-7M) City Council Conditions of Approval Page 5 <br /> <br /> <br />