Laserfiche WebLink
1 authorizes an additional 20.2 MGD of interruptible capacity, in addition to the firm <br />2 capacity of 19.72 MGD and interruptible capacity of 1.28 MGD provided in the existing <br />3 agreements. <br />4 1.2 "Interruptible flow basis" means that all LAVWMA instantaneous flow rates <br />5 exceeding 19.72 MGD are restricted to the difference between the EBDA pipeline's <br />6 maximum capacity of approximately 189.1 MGD and the actual total combined <br />7 instantaneous flow from all E°~A member agencies plus LAVWMA's firm capacity of <br />8 19.72 MGD of instantaneous rate of flow. This additional flow is the interruptible capacity. <br />9 The interruptible capacity is variable and dynamic as the actual flow rates change <br />10 continuously throughout any given hour, day and season. As an example, for the total <br />11 system capacity of 189.1 MGD, when the combined EBDA member agency instantaneous <br />12 flow reaches 169.4 MGD, all LAVWMA instantaneous flow beyond 19.72 MGD shall be <br />..~ . <br />13 interruptedt subjectao .EBDA's ~rghtto allow additianal' use of any unused capacity during <br />14 short cluratiorl. peak Rows as pFOVided to the existing agreements. <br />15 1.3 The parties shall cooperate in developing a separate operating procedure <br />16 that fully describes operation, responsibilities, and communication procedures during wet <br />17 weather flow conditions such that both systems are protected and that spills and/or <br />18 overflows are prevented. Said operating procedure shall not in any way modify the terms <br />19 and conditions set forth in this Agreement. <br />20 1.4 S~ttbject io Pari~grapl7 &7; #~his Agreement sets forth the entire <br />21 understanding among the parties concerning LAVWMA's discharge of an additional 20.2 <br />22 MGD interruptible flow into the EBDA system. <br />r rev. o per point mtng o c o er , <br />