Laserfiche WebLink
49. "1"he applicant shall submit a site soils report to the ChiePl-3uild ing Official, with. as many <br />copies as raq uired by the Chief Building O1Fci al, prior to issuatiec of a grading permit, <br />for third. party peer review and shall pay for such review at the time specified. <br />50. "I'he record-grading plan is to be subn2i tted to the Chief Building Official before issuan ec <br />of a building permit. <br />5 1 _ The soils engineer shal] certify the pad compactions of all lots containing till to the <br />sett siaciion of the Chief Building OFf cial prior to the issuance of building perrrxits_ <br />52. Building and sites plates are to be subtr~itted to the Buildin~T and Safety Division on <br />con"tputer disk in a t~~rmat approved by the Chief Building OiTicizxl. Digitized <br />info rn"t ateon shall. be submitted before requesting, a final inspection :, ."td should reflect <br />as-built sites and architectural information as approved by the Chief Building Uffi ci al_ <br />53. All site itnpro vements and house construction activities shall be limited to the hours of <br />8:00 a._n"t_ to 5:00 p_xrt_, Monday through Friday- All construction equiptrxcnt trust meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. No constriction shall be allowed on Federal holidays- <br />54. A temporary construction trailer shall be allowed on site during construction for use <br />during the allowed hours of operation. - At no time shall campers. trailers, n"totor homes, <br />or any other vehicle be used sxs living or sleeping quarters on the construction site. All <br />such vehicles shall be removed from the site at the end of each workday. <br />55. I£ any prehistoric or historic artifacts or other indications of cultural resources are found <br />once the project consri-~tction is underway, all work u~ust stop within 20 meters X66 teats <br />of the find. A qualified archaeologist shall be consulted fbr an imn-icdiate evaluation of <br />the find prior to resuming, ground-breaking construction activities within 20 xzxcters of the <br />find. If the find is determined to be an important archaeological resource, the resource <br />shall be either avoided, if feast blc, or recovered consistent with the requircm cats of <br />Appendix I{ of the State CEQA Guidelines- In the event of discovery or recognition of- <br />any ttun"tan remains in any on-site location. there shall be no further excavation or <br />disturbance of the site or any nearby area reasonably suspected to overlie adjacent <br />remains until the County coroner has determined, in accordance with any law concerning <br />invcstigatic>n cif the circumstances the man ner and cause off death and has made <br />recon~n~end ations concerning trcaurtcnt and dispositions of the human remains to the <br />person responsible for the excavation or to his/her authorized representative- A similar <br />note shall appear on the iniprovetnent plans. <br />56. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor- <br />57. "17ze applicant shall obtain al] building, encroachment, and other applicable City porn-sits <br />for the project prior to the commencement of construction- <br />8 <br />