Laserfiche WebLink
2rJ_ At no time shall can-xpers, trailers, xrrotor hoxrxes, or any other vehicle be used as living or <br />sleeping quarters on the construction site_ All such vehicles shall be rexrxoved from the site at the <br />end of each workday. A temporary construction trailer shall be allowed on site during <br />construction for use during the allowed hours of operation_ <br />30_ If archeological materials are uncovered during grading, trenching, or other on-site excavation, <br />all work on site shall be stopped and the City imrncdi ataly notified. "1"he county coroner and the <br />Native Anzericat~ Heritage Commission shall also be noti tied and proccdtires followed as <br />required iu Appendix K of the California Environmental Quality AcL_ A similar note shall <br />appear on the improvement plans. <br />3 1 _ The applicant shall maintain the area surrounding the project in a clean a.nd orderly ma.r~nar at alt <br />ti Hies. <br />32. The project developer shall sweep or vacuum the parking lot and sidewalks a niinixrxum of once a <br />month and shall prevent the accumulation of litter and debris on the site_ Corners aazd hard to <br />reach areas shall he swept nianually_ If sidewalks and/or the. parking lot arc pressure washed, <br />debris irxust be trapped and collected to prevent entry into the sto nn drain system. No cleaning <br />agent n-xay be dischzu ged into the storn2 drain. If any cleaning agent or degreaser is used, wash <br />water must be collected and discharged to the sanitary sewer, subj ect to approval of the Dublin- <br />San Ramon Services District ~DSRSD~_ <br />33 _ The project developer shall submit a waste management plan to the Building Department prior to <br />issuance of building or demolition. pcrirxits. The plan shall include the estimated cotrxposition <br />and quantities of waste to be generated and how the project developer intends to recycle at least <br />50`% (tiny percent) of the total _job site con struciion and demolition waste measured by weight or <br />volumc_ Proof of compliance shall be provided to the Chief Building Official prior to the <br />issuance ofa f3na1 building permit_ During demolition acid construction, the project developer <br />shall mark all trash disposal bins "trash materials only" and all recycling bins "recycling <br />n-xatcri als only"_ The project developer shall contact Pleasanton Csarbage Service for the disposal <br />of all waste from the site_ <br />LANDSG'AYING AND IRRIGATION SYSTEM DESIGN AND OPEI2_ATIC~Nc <br />34_ The project developer shall easier into an agrccrTxent with the City, approved by the. City <br />Attorney, which guarantees that all landscaping and open space areas included in this project will <br />be maintained at all times in a. manner consistent with the approved landscape plan For this <br />development. Said agreement shall run with the land for the duration of the existence of the <br />structures located on the subject propcrty_ All proposed and required landscaping shall be <br />irrigatod_ The sift irrigation design shall utilize low-volume drip, bubbler, or other water <br />conserving irrigation systcrns to max ixnize water conservation to the gre eta st extant possible. <br />The irrigation systems shall includes a soil moisture, rain sensor, or other irrigation efficiency <br />d avice_ The proposed type of irrigations afticiancy device shall be shown on the plans submitted <br />l~~x- the issuance of building pcnTxits. <br />