My WebLink
|
Help
|
About
|
Sign Out
PC 2005-41
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-41
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:33:57 PM
Creation date
3/6/2006 10:22:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/10/2005
DOCUMENT NO
PC 2005-41
DOCUMENT NAME
PCUP-133 & PDR-440
NOTES
CUBIX CONSTRUCTION
NOTES 3
CONSTRUCT & OPERATE SELF STORAGE FACILITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engineer for ten-iporary use of an existing well for construction water. Any wells <br />designated for abandonment or nay wells, encountered during construction, are to be <br />destroyed in accordance with a permit obtained from Zone 7. <br />89. The design for the line, grade, and structural sections for the streets serving this <br />developnicnt shall be subj ccL to i-inal review and approval by the City Engineer. <br />9U. Any existing septic tanks or holding tanks shall be removed or sealed, t311ed, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />S erV lCes_ <br />91. The project developer's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site. <br />92. "I'he haul route for all materials to and iron this development shall be approved. by the <br />City Engineer prior to the issuance of au exicroaehnient permit. <br />93_ The project developer shall submit a dust control plan or procedure as part of the building <br />permit plans. <br />94. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer- <br />95. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zonc 7, as applicable, that the system is adequate, comzects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Plood Control District -Zone 7, nzects any and all applicable requirements of the <br />Federal Emergency Management Flood 1-iazard Program, the Caliibrnia Department of <br />Fish and Game, and meets the immediate and long-range requircm eats of this <br />development and all upstream areas intended to be drained through this development. <br />96. Electric power distribution, gas distribution, communication service, Cable television, <br />and any required alarm systems shall he installed underground in a joint utility trench <br />unless otherwise specifically approved by the City Engineer or Director of Building <br />Inspection- Utility trenches shall be installed as far away iron the existing trees as <br />feasible to ensure that their health is maintained. <br />97. Any damage to existing street improvcnients during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the project <br />developer. "This shall include slurry seal, overlay, or street reconstruction if deemed <br />warranted by the City Engineer- <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.