My WebLink
|
Help
|
About
|
Sign Out
PC 2005-32
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:32:27 PM
Creation date
3/6/2006 9:13:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/13/2005
DOCUMENT NO
PC 2005-32
DOCUMENT NAME
PCUP-145
NOTES
BERATLIS AND HATSUSHI
NOTES 3
STOCKPILING APPROX 10,694 CU YDS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b_ All cut and fill slopes shall be rcvegetated and stabilized aRer completion of grading., <br />but in no case later than Uctober 15_ Hydroseeding shall he accoxrxplished before <br />S eptexrxber 15 and irrigated with a temporary irrigation system to ensure that the <br />grasses are established before October 15_ No grading shall occur between October <br />1 5 and April 7 5 unless approved erosion control/stonrx water quality measures are in <br />place, subject to the approval of City Engineer- Such measures shall be maintained <br />until such tine as pern~anent landscaping is place- <br />c. Rexn ove all dirt, gravel, rubbish, refuse, and gram waste tt-oni the street pavexrxcnt <br />and stonrt drains adjoining the site. Limit construction access routes onto the site and <br />place gravel on then-x. Do not drive vehicles and equipment off paved or graveled <br />areas during wet weather- Broom sweep the street pavement adjoining the project site <br />on a daily basis- Scrape caked-on nrud and dirt from these areas before sweeping. <br />d_ Install filter matcri als (such as sandbags, Inter Fabric, etc_ at the storm drain inlet <br />nearest the dovvxistream side of the project site ixi order to retain any debris or dirt <br />flowing in the storn-x drain system. Maintain and/or replace Flter materials to ensure <br />effectiveness and to prevent street flooding- <br />(~vxdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.