My WebLink
|
Help
|
About
|
Sign Out
PC 2005-23
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:31:08 PM
Creation date
3/1/2006 5:01:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/2005
DOCUMENT NO
PC 2005-23
DOCUMENT NAME
PDUP-7
NOTES
DOUGLAS & PATRICIA SUTTON
NOTES 3
ALLOW DAY CARE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br />CONDITIONS OF APPROVAL <br />PDR-448 and PCUP-139, Fairland Irwestment, Inc_ <br />3595 and 3597 Utah Street <br />May 25, 2005 <br />Project Specific COnd1tIOTS] <br />1 _ The full service carwash covered by this approval shall be constructed and operated in <br />substantial conformance. to the development plans, Exhibit "A", dated ^Received <br />April 26, 2005" on file with the Planning Department, unless moth Fied by the Following <br />conditions, acid to the following conditions_ Minor changes to the plaits may be allowed <br />sut~ject to the approval of the Planning Director if fowid to be in substantial conformance <br />to the approved exhibits. <br />2_ A comprehensive signing program showing the locations, sizes, and construction details <br />of all building and site signs shall be submitted to the Planning Director for consideration <br />under a separate application. <br />3. The design review and conditional use permit approvals will lapse within one year from <br />the effective date of this approval unless a building permit is issued and construction has <br />commenced and is diligently pursued toward completion or an. extension has been <br />approved by the City. <br />4. The project developer shall submit a lot line adjustment to merge the two properties <br />cotnpri sing the project site for review and -approval before the building permit is issucd_ <br />5. The project developer shall modify the design of the building's north elevation, adding a <br />second gable element. The centerline of the gable shall be aligned with the centerline of <br />the existing gable. This change shall be shown on the building permit plan set to the <br />satisfaction of the Planning Director before the building permit is issucd_ <br />6_ A71 HVAC and other mechanical equipment shall be installed within the attic area of the <br />building covered by this approval. Ventilation louvers For the HVAC eq ui pir~ent shall be <br />provided on the north and south gable ends of the building. The louvers shall be painted <br />the exterior building wall color. These details shall be shown on. the building permit plan <br />set to the satisfaction of the Planning Director before issuance of a building permit. <br />7_ The project developer shall install an entry wall. on the west side of the shared driveway <br />front Utah Street matching the entry wall on the opposite side of the driveway on the <br />service station property. The wall details shall be shown on the building permit plan set <br />to the satisfaction of the Planning Director before the building permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.