Laserfiche WebLink
Trash areas, dumpsters and recycling containers shall be enclosed and roofed to <br />prevent water run-on to the area and runoff From the area acid to contain litter and <br />trash, so that it is not dispersed by the wind or runoff during waste removal. <br />These areas shall not drain to the storm drain system, but to the sanitary sewer <br />system and an area drain shall be installed in the enclosure area, providing a <br />structural control such as an oil/water separator or sand filter_ No other area shall <br />drain into the trash enclosure, a beriri shall be installed to prevent such drainage if <br />found necessary by the City Engineer/Director of Building Inspection_ A sign <br />shall be posted prohibiting the dumping of hazardous n~tatcri als into the sanitary <br />sewer. The project developer shall notify the Dublin-San Ramon Services District <br />~DSRSD~ upon installation of the sanitary connection, a copy of this notification <br />shall be provided to the Planning Department <br />£ All paved outdoor storage areas shall be designed to minimize pollutant runoff. <br />g. Prior to grading permit issuance, the project developer shall submit a copy of the <br />State Water Resources Control Board Notice of Intent (NOi~ for coverage under <br />the State Construction Storm Water General Permit for projects with clearing, <br />grading and excavation exceeding the current standards. <br />h_ All metal roofs shall be finished with rust-inhibitive paint <br />Roof drains shall discharge and drain away from the bui]ding foundation to an <br />unpaved area wherever practicable. <br />Urban Stormwater Construction Requirements <br />70_ The project developer shall submit a Stormwater Pollution Prevention Ylan <S WI'P) for <br />review and approval by the City Engineer prior to issuance of building or grading <br />permits. Failure to comply with the approved construction SWPPP may result in the <br />issuance of correction notices, citations or stop work order. The following construction <br />Best Management Practices <BMPs), as well as any other applicable measure, shall be <br />included in the SWPPP and implemented as approved by the City. <br />77 . The project developer is responsible for implementing the following nieces ures during all <br />construction phases of the proj act <br />a. The project developer shall include erosion control/storm water quality measures <br />on the final grading plan which shall specifically address measures to prevent soil, <br />dirt, and debris from entering the storm drain systeni_ Such measures may <br />include, but are not limited to, hydroseeding, hay bales, sandbags, and siltation <br />fences and are subject to the review and approval of the Director of Building <br />Inspection. The project developer is responsible for ensuring that the contractor is <br />aware of and implements such measures. <br />10 <br />