Laserfiche WebLink
f_ Obtain a building permit from the Building Department and airy other applicable <br />City permits for the projact prior to the commencement of any construction~ <br />g. Pay any and all fees to which the property may he subject prior to issuance of a <br />building pcrxriit_ The type and amount of the Fees shall be those in effect at the <br />time the building permit is issued. <br />h_ The project developer shall include erosion control/storm water quality measures <br />on the hnal grading plan which shall specifically address measures to prevent soil, <br />dirt, and debris from entering the storm drain. system. Such measures may include, <br />but are riot lirrx ited to, hydro seeding, hay bales, sandbags, and siltation fences and <br />are subject to the review and approval of the Director of Building Inspection. <br />i. The building permit plan check xaaterials will be accepted for submittal only after <br />the ordinance approving the PUD development plan becomes effective. unless the <br />projact developers submits a signed statement acknowledging that the plan check <br />fees may be forfeited in the event that the ordinance is overturned or that the <br />design is significantly changed- In rxo case will a building permit be issued prior <br />to the effective date of the ordinance. <br />1 1 . All structures covered by this approval shall be constructed to: <br />a. Meet Title 24 state energy requirements, and <br />b_ Comply with all codes and ordixianccs in effect before the Building Department <br />will issue permits- <br />12. The project developer shall submit two topics of the site soils report to the Director of <br />Building Inspection for third party pear review and shall pay for such review at the time <br />specified by the Director, but in all cases before the issuance of a grading permit. <br />] 3. Prior to final building, Hermit inspection, a final inspection by the Planning Department is <br />required prior to occupan cy_ <br />14. During Construction, the prof cct developer is responsible for irnplcn-xcnting the following <br />n-xeasures= <br />a. Portable toilets shall be kept as far as possible from existing residences and shall <br />be emptied on a regular basis as necessary to prevent odor. <br />b. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropri eta, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution- <br />3 <br />