Laserfiche WebLink
c. Broom sweep the public/private sheet pavement adjoining the project site on a <br />daily basis. CJaked-on mud or dirt shall be scraped from these areas before <br />S Weeping. <br />d_ Install filter materials (such as sandbags, filter fabric, ete.j at the storm drai» i»let <br />nearest the downstream side of the project site in order to retain airy debris or dirt <br />flowing inio the City ston~n drain system. Filter materials shall be maintained <br />and/or replaced as necessary to ensure effectiveness and prevent street flooding- <br />Dispose of filter particles in the trash. <br />e. Create a contained and covered area on the site for the storage of bags, cements, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br />project site that have the potential for being discharged to the storm drain system <br />in the event of a materials spill or through wind action. <br />£ Never clean machinery, tools, brushes, cte_, or rinse containers into a street, <br />gutter, storm drain, or system- <br />g. Ensure that concrete/gunite workers, concrete/plasterer workers., supply trucks, or <br />painters do not discharge wash water into street gutters or drains- <br />{i-ndj <br />7 <br />