Laserfiche WebLink
law and local ordinance. The present program is described in documents entitled <br />"Cooperation Agreement" acid "Flat Fee Agreement" The developer shall be required to <br />participate in the above-referenced program, as it may be amended, or in any successor <br />program, prior to issuance of any building permit for the project. <br />1 5. Prior to issuance of a building permit, the applicant shall pay the applicable Zone 7 and <br />City connection fees and water meter cost 1'or any water meters. Additionally, the project <br />developer shall pay any applicable Dublin San Ramon Services District ~DSRSD~ sewer <br />permit Fee. <br />1 Fi_ The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve taxis development by the approval of this <br />case, and that the project developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the City not to be available_ <br />17. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied For, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. <br />Notwithstanding the prof eci developer's participation in such a program, the City may <br />withhold building permits if the City determines that sufficient water is not available at <br />the time of application of building permits_ <br />18. The project developer shall submit a waste generation disposal and diversion plan to the <br />Building Department prior to issuance of building or demolition permits_ The plan shall <br />include the estimated composition and quantities of waste to be generated and how the <br />project developer shall recycle at least fifty percent (50%) of the job site construction and <br />demolition waste. Proof of compliance shall be provided to the Chief Building Official <br />prior to the issuance of final occupancy. During demolition and construction, the project <br />developer shall mark all trash disposal bins "trash materials only" and all recycling bins <br />"recycling materials only". The project developer shall contact Pleasanton Garbage <br />Service for all waste disposal_ Only that portion o£ trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another trash recycling <br />company. <br />19_ This development shall be considered as a "first-coxr~c., first-served" project for growth <br />management purposes. <br />20_ Final inspection by the Planning Department is required prior to occupancy. <br />Building Permit Rcvi~w: <br />27. To initiate the building permit plan check process, the applicaxit shall submit the <br />following= <br />a_ Three ~3~ Full-size sets of construction plans wet-stamped and signed; <br />3 <br />