My WebLink
|
Help
|
About
|
Sign Out
RES 97041
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1997
>
RES 97041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2012 2:29:14 PM
Creation date
11/6/1998 5:24:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/6/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The member agencies shall initiate a v,'astewater disposal expansion project that <br /> includes the construction of a new pipeline with a capacity of 21 mgd P~'WF <br /> followed immediately by the relining of the existing pipeline which will then have <br /> a 20.2 mgd PW~'F capacid'. The initial project will also include an expanded export <br /> pumping station and force main. The project will also include. at the appropriate <br /> time. a Livermore funded pump station to increase capacity in the cross valley <br /> interceptor. The total 41.2 mgd PWWF capacity is tentatively allocated as follows: <br /> Livermore 12.4 mgd; Pleasanton 14.4 mgd; and DSRSD 14.4 mgd. Two member <br /> agencies may transfer between them a portion of their allocation upon mutual <br /> agreement. <br /> <br />6. LAVWMA will investigate the possibility of proceeding on an early schedule of <br /> planning and/or construction to insure the protection of public health and, if <br /> appropriate, with DSRSD providing early phase financing. <br /> <br />7. Wastewater disposal expansion project capital cost sharing between member agencies <br /> for the relining of the existing pipeline shall be in proportion to the current <br /> LAVWMA 21.0 mgd ADMMF allocated as follows: Livermore 8.727 mgd; <br /> Pleasanton 7.503 mgd; and DSRSD 4.770 mgd. Capital cost sharing between <br /> member agencies for the remaining elements of the wastewater disposal expansion <br /> project, including all EBDA project costs, shall be in proportion to the difference <br /> between the total PW~v'F capacity and the current ADMMF which is 20.2 mgd and <br /> shall be allocated as follows: Livermore 3.673 mgd; Pleasanton 6.897 mgd; and <br /> DSRSD 9.630 mgd. <br /> <br />8. The member agencies will operate all in-valley disposal facilities, including storage <br /> ponds and reverse osmosis facilities. in a coordinated manner to minimize the risk <br /> of a LAVWMA overflow under PWWF conditions. <br /> <br />9. When an individual member agency reaches 75% of its PWWF allocated capacity set <br /> forth above and at the overflow frequency established by the RWQCB, the member <br /> agencies agree to cooperate in identifying and implementing or allowing <br /> implementation of additional facilities, such as storage or stream discharge or chain <br /> of lakes discharge, to provide additional. _PWWF capacity up to the amount required <br /> at buildout of the ADWF influent limit set forth above. If proposed facilities include <br /> additional export pipeline capacity, unanimous member agency approval will be <br /> required. The new facilities will be paid by the member agencies in proportion to the <br /> allocated PWWF capacity in the additional facilities. <br /> <br />10. Upon endorsement of these principles by the LAVWMA Board, LAVWMA staff will <br /> be directed to prepare detailed project cost estimates, phasing plans and options for <br /> disposal of wet weather capacity pending project implementation, analysis of service <br /> fees and connection fees for each jurisdiction, preliminary financing plans, and <br /> environmental review. <br /> <br /> 2 04110197 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.