My WebLink
|
Help
|
About
|
Sign Out
SR 06:019
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2006 1:40:23 PM
Creation date
2/16/2006 1:26:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Wes Jost <br />Police Dispatch Remodel Fee <br />December 2, 2005 <br />Revised Jan 5, 2006 <br />Page 2 <br /> <br />Bidding <br />Principal <br />Project Architect <br /> <br />4 hours@ $100 ~ <br />8 hours@$100= <br />Subtotal <br /> <br />$ 400 <br />$ 800 <br />$ 1,200 <br /> <br />Subtotal DO's <br />Thru Bidding $ 17,700 <br /> <br />Construction Administration (assumes 4 month construction time) <br />Principal @$IOO= $ TIM <br />Construction Administration <br />(18 weeks x 5 hours/week average) @ $100 = $ TIM <br /> <br />Reimbursables - Allowance - not to be exceeded $ 1,500 <br /> <br />3.2 Electrical- See attached KCK proposal <br /> <br />3.3 Security Electronics - See attached OnLine proposal. <br /> <br />Summary Fee Proposal Design Develop.! Const. Total Reimbursable <br /> Const Docs. Biddinl! Admin Fee Allowance <br />George Miers & Associates $16,500 $1,200 $ TIM $17,700 $1,500 <br />KCK (Electrical) $ 3,550 $ 250 $ TIM $ 3,800 $ 500 <br />OnLine (Security Electronic) $ 8,290 $ 750 $ TIM $ 9,040 $ 750 <br />Plumbinl! Assistance $ 500 - - $ 500 - <br />TOTAL $28,840 $2,200 $ TIM $31 040 $2 750 <br /> <br />4.0 EXCLUSIONS <br />4.1 Mechanical Engineering - To be provided by the City. GMA will coordinate with them. <br /> <br />4.2 As Built Drawiugs - GMA has prepared base drawings from City provided existing building plans. <br />We have then adjusted them to existing field conditions based upon a visual walk through. These <br />plans are not intended to be a detailed description of all existing conditions. Similarly, GMA's <br />proposed Scope of Work does not include producing final As Built's after construction. GMA's <br />specifications will require the General Contractor to provide As Builts. <br /> <br />4.3 Furniture Systems and Dispatcher's Console Design - These are not part of the Scope of Work. <br />GMA will assist City Staff with the selection of these vendor purchased items. <br /> <br />4.4 Any work or discipline not specifically described herein. <br /> <br />We look forward to working with you and the Police Department to complete this much needed project. <br />Please call me should you have any questions. <br /> <br />Sincerely, <br /> <br />George Miers <br />
The URL can be used to link to this page
Your browser does not support the video tag.