<br />BUDGET AND ESTIMATED COST OF IMPROVEMENTS <br /> <br />The current available funding for this project is $2,116,236, from the Parks CIP Fund <br />(derived from the City's General Fund, Park Dedication Fees, and Public Facilities Fees), and <br />$179,260 from a State Parks bond allocation (a total of $2,295,496). Staff recently asked Ian <br />Leverton & Associates, project cost estimators, to update an earlier estimate for the project's <br />construction cost. Conditions of this estimate included estimating for a spring, 2006 <br />construction start, updating materials and fuel costs, and adding an "allowance" for the legal <br />removal of any toxic substances on the site. The resulting Estimate of Probable Cost is <br />$4,022,730, including a construction contingency for any unforeseen field conditions or <br />changes in the work that may be required. This results in a shortfall of approximately <br />$1,727,234. Attachment A includes a project illustration and cost breakdowns for all major <br />elements of the park. <br /> <br />DISCUSSION <br /> <br />In order to complete the entire project as proposed by the Parks and Recreation Commission <br />and Project Task Force, it would be necessary to direct additional funds to the project. As <br />requested by the Council, the Commission reviewed the project's status and considered <br />funding options, including a phased approach, at its August 2005 meeting. The Commission <br />reviewed existing CIP projects and potential fund balances, identifying approximately <br />$543,000 that could be transferred to offset the project shortfall. This included $153,000 <br />from the Sutter Gate Park Expansion Project, CIP #047016; $280,000 from Aquatic Center <br />Expansion Phase II, CIP #007036; $50,000 from South Pleasanton Neighborhood Park, CIP <br />#017042; and approximately $59,000 raised through the two (2) "Udder Event" fundraisers. <br />Even with these transfers, the project would still be nearly $1.2 million short. <br /> <br />As an additional alternative, the Commission expressed interest in using In-Lieu Park <br />Dedication fees to make up the funding shortfall. Staff explained that in 1998, when the City <br />Council adopted the Public Facilities Fee plan, it was determined that Park In-Lieu fees <br />collected after January 1999 would be used solely for the purchase of future park land. <br />Although State law allows for Park In-Lieu fees to be used for improvements to community <br />parks, the Council wanted to avoid the perception that development was being "double <br />charged" with the adoption of the Public Facilities Fees. The Commission, however, still felt <br />this was a viable funding alternative and included it as an option for the Council to consider. <br />Copies of the Commission minutes are included as Attachment B. <br /> <br />Alternatively, the project's improvements could be significantly scaled back to allow for park <br />construction within the existing budget - and possibly for the additional funds described <br />above. For example, by eliminating some of the major improvements, namely the Milking <br />Barn/Visitor's Center, Bunkhouse and Interpretive Program, a cost reduction of approximately <br />$1.21 million could be achieved. This strategy would still allow for the development of major <br /> <br />SR 06:062 <br />Page 4 <br />