My WebLink
|
Help
|
About
|
Sign Out
SR 06:018
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2006 3:07:57 PM
Creation date
2/2/2006 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/7/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'lHt'(.:..... 'C.:J 14:o.J4 I_HL :~I'''d'i~ t.i'tt..:.. ~'/l.- <br /> <br />P.13 <br />st. Aqmt. No. 4-ll79-c <br /> <br />will automatically be vested in STATE, and all materials, equip- <br />ment and appurtenances installed outside of STATE's right of way <br />will automatically be vested in CITY. All traffic signals and <br />safety lighting, materials, equipment, and appurtenances in- <br />stalled on PROJECT shall be owned by STATE regardless of the lo- <br />cation of the installation except for the TI-70 controllers which <br />will be owned, operated and maintained by CITY as stated in Sec- <br />tion (I) Article (16) and no further agreement will be necessary <br />to transfer ownership as stated herein above. <br />(13) Nothing in the provisions of this Agreement is in- <br />tended to create duties or obligations to or rights in third par- <br />ties not parties to this contract, or affect the legal liability <br />of either party to the contract, by imposing any standard of care <br />respecting the maintenance of State highways different from the <br />standard of care imposed by law. <br />(14) CITY may, at its sole option and in accordance <br />with Article (2) of Section I, retain one or more consultants to <br />perform services pursuant to Article (1) of Section I or adminis- <br />ter the construction contract for PROJECT. <br />(15) CITY and CITY'S construction contractor (and con- <br />struction engineering consultants, if any) shall maintain in <br />force, until completion and acceptance of the PROJECT con- <br />struction contract, a policy of Contractual Liability Insurance, <br />including coverage of Bodily Injury Liability and Property Damage <br />Liability with limits of not less than those specified in Section <br />7-1.12 of STATE's Standard Specifications. Such policy shall <br /> <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.