My WebLink
|
Help
|
About
|
Sign Out
SR 06:018
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2006 3:07:57 PM
Creation date
2/2/2006 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/7/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IHI'( 14 C'=' .l......~~..::S 1.-HL j/"':Hl'l~ t.:1!..;o. ::,"0/"- <br /> <br />P.12 <br />st. Agmt. ~o. 4-1179-C <br /> <br />(10) Pursuant to the authority contained in Section 591 <br /> <br /> <br />of the Vehicle Code, STATE has determined tbat within such areas <br /> <br /> <br />as are within the limits of PROJECT and are open to public traf- <br /> <br /> <br />fic, CITY shall comply with all of the requirements set forth in <br /> <br /> <br />Divisions 11, 12, 13, 14, and 15 of the Vehicle Code. CITY shall <br /> <br /> <br />take all necessary precautions for sate operation of CITY's vehi- <br /> <br /> <br />cles, the construction contractor's equipment and/or vehicles of <br /> <br /> <br />the consultants retained by CITY and for the protection of the <br /> <br /> <br />travelinq public from injury and damaqe from such vehicles or <br /> <br /> <br />equipment. <br /> <br />Ill) In the event CITY fails to pay CITY's contractor <br /> <br /> <br />for work properly completed within the time period specified in <br /> <br /> <br />CITY's contract, or if CITY's contractor fails to prosecute the <br /> <br /> <br />contract to construct PROJECT within the te~ thereot, or within <br /> <br /> <br />the terms of this A9reement or the Encroachment Permits issued <br /> <br /> <br />either to CITY or to CITY's contractor, STATE shall thereafter <br /> <br /> <br />have the right to cancel the Encroachment Permits issued to CITY <br /> <br /> <br />and to CITY's contractor. STATE shall thereafter complete <br /> <br /> <br />PROJECT in the most expeditious manner available. In the event <br /> <br /> <br />STATE must complete PROJECT in this manner, CITY will be liable <br /> <br /> <br />tor all costs incurred by STATE except for STATE's share of the <br /> <br /> <br />expense of construction cost for PROJECT pursuant to'Article (II <br /> <br /> <br />of Section II of this Aqreement. <br /> <br /> <br />1121 That upon completion of all work under this Aqree- <br /> <br /> <br />ment, ownership and title to all materialS, equipment and <br /> <br /> <br />appurtenances which are installed within STATE's right of way <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.