Laserfiche WebLink
<br />:lAP 1:: --:.:.: ~O ,:~'- -c,.:.; .': _ .'~. _ <br /> <br />".4 <br /> <br />D t. Agmt. ~..O. 4-1179-C <br /> <br />G7-Mastarm mounted street name signs) and overhead sign struc- <br /> <br />tures. <br /> <br />(2) To furnish hardware for mounting sign panels as <br /> <br />follows: <br /> <br />a. Blind rivets for mounting overlapping legend at sign <br />panel Jo~nts. <br />b. Closure inserts. <br />c. Aluminum bolts and nuts and steel beveled washers for <br />mounting laminated sign panels on overhead sign struc- <br />tures. <br />d. Aluminum bolts, nuts, and washers for mounting overhead <br />formed panels. <br /> <br />(3) To furnish to the City upon written request 30 <br />days in advance of intended installation at the site of the <br />project or at the Department of Transportation's Warehouse ,930 <br /> <br />East tllth Place, 105 Angeles, California, at the option of the <br />CITY. In addition to the written request 30 days in advance of <br /> <br />intended installation as required by Section 6-1.02, of STATE's <br />Standard Specifications, the CITY shall, within 30 days of re- <br />ceiving notice that the contract has been approved, notify the <br /> <br />Engineer in writing at which location such panels are to be de- <br /> <br />livered. <br /> <br />(4) To furnish a Type 170 controller and a Model 332 <br /> <br />cabinet for ramp metering. <br /> <br />(5) Immediately following execution of this Agreement, <br />to bill CITY for the total cost of the furnished materials men- <br /> <br />tioned in Articles (1),(2) and (4) of Section II. Said cost is <br />currently estimated at approximately $32,0000 for sign panels and <br />approximately $10,000 for ramp metering equipment. <br /> <br />-8- <br />