My WebLink
|
Help
|
About
|
Sign Out
SR 06:018
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2006 3:07:57 PM
Creation date
2/2/2006 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/7/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'1-11-0:...... _~ ':'~:iJO :~.";L 1:=':':,5 c::.:iG. ';',l.- <br /> <br />P.? <br />L t. Agmt. ~o. 4-1179-C <br /> <br />(19) Upon completion and acceptance of PROJECT con- <br />struction contract, to furnish STATE with a complete set of full- <br />sized film positive reproducible record plans and other records <br />as required in STATE's Construction Manual. <br />(20) To replace '1'1-70 controllers with 170 controllers <br />if STATE determines that operation and/or maintenance of the sys- <br />tem is inadequate. <br />(21) To maintain all portions of Stoneridge .Drive and <br />any City streets located outside STATE's existing and proposed <br />right of way and make no claims against STATE for any portion of <br />such maintenance expense. <br />(22) To maintain at CITY's expense, those portions ot <br />the overcrossing structure(s) at and above the concrete deck sur- <br />face (except bridge pedestrian screenings, if anyl, including the <br />deck surfacing placed thereon. ana to perform such work as may be <br />necessary to maintain all lighting installations, and other ta- <br />cilities that are required for the benefit or control of CITY's <br />street traffic, including the traffic control signals installed <br />as part of PROJECT and pay an amount equal to 50 per cent of the <br />total maintenance costs including electrical energy costs for the <br />signals. <br /> <br />SECTION II <br /> <br />STATE AGREES: <br />(11 To furnish sign panels for roadside signs (Guide <br />signs-G Series only, including sign overlays and excluding <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.