Laserfiche WebLink
co <br />nouaatl <br />svoM ollgnd <br />Public Works <br />Public Works <br />Public Works <br />Public Works <br />Public Works <br />P.- <br />x <br />9 <br />X <br />x <br />x <br />in <br />mr <br />Mitigation Strateav <br />I <br />i <br />I <br />Develop an approach and locations for various <br />watercourse bank protection strategies, including for <br />example, (1) an assessment of banks to inventory <br />areas that appear prone to failure, (2) bank <br />stabilization, including installation of rip rap, (3) stream <br />bed depth management using dredging, and (4) <br />removal of out -of -date coffer dams in rivers and <br />tributary streams. <br />Use reservoir sediment removal as one way to increase <br />storage for both flood control and water supply. <br />stream flow and maintain critical access and egress <br />routes. <br />epra LQI nenl V, ,cvcca lnal a,c VUll 101av,c ,v wuurac <br />from earthquake- induced shaking or liquefaction, <br />rodents, and other concerns, particularly those <br />protecting critical infrastructure. <br />Ensure that utility systems in new developments are <br />constructed in ways that reduce or eliminate flood <br />damage. <br />Determine whether or not wastewater treatment plants <br />are protected from floods, and if not, investigate the <br />use of flood control berms to not only protect from <br />ctrnam nr river flnnrfinn hilt alsn increasinn plant <br />Work cooperatively with water agencies, flood control <br />districts, Caltrans, and local transportation agencies to <br />determine appropriate performance criteria for <br />watershed analysis. <br />Work for better cooperation among the patchwork of <br />agencies managing flood control issues. <br />a <br />o <br />r <br />c <br />cli <br />Co <br />O <br />0) <br />L <br />C <br />O <br />R <br />a <br />2 <br />co <br />G) <br />