My WebLink
|
Help
|
About
|
Sign Out
RES 06003
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 2:53:51 PM
Creation date
2/1/2006 4:40:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/17/2006
DOCUMENT NO
RES 06003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sil <br />nouaoy <br />Public Works and Zone <br />7 existing programs <br />Zone 7 is the <br />responsible agency <br />Zone 7 is the <br />responsible agency <br />Public Works <br />Public Works <br />sNJoM ollgnd <br />Public Works <br />Public Works <br />1< <br />I <br />l -9- <br />x <br />x <br />X <br />Mitiaation Strateav <br />Conduct a watershed analysis of runoff and drainage <br />systems to predict areas of insufficient capacity in the <br />storm drain and natural creek system. <br />Develop procedures for performing a watershed <br />analysis to look at the impact of development on <br />flooding potential downstream, including communities <br />outside of the jurisdiction of proposed projects. <br />Conduct a watershed analysis at least once every three <br />years. <br />Assist, support, and /or encourage the U.S. Army Corp <br />of Engineers, various Flood Control and Water <br />Conservation Districts, and other responsible agencies <br />to locate and maintain funding for the development of <br />flood control projects that have high cost benefit ratios <br />(such as through the writing of letters of support and /or <br />passing resolutions in support of these efforts). <br />Pursue funding for the design and construction of storm <br />drainage projects to protect vulnerable properties, <br />'including property acquisitions, upstream storage such <br />as detention basins, and channel widening with the <br />associated right -of -way acquisitions, relocations, and <br />environmental mitigations. <br />Continue to repair and make structural improvements <br />to storm drains, pipelines, and /or channels to enable <br />them to perform to their design capacity in handling <br />water flows as part of regular maintenance activities. <br />Continue maintenance efforts to keep storm drains and <br />creeks free of obstructions, while retaining vegetation in <br />the channel (as appropriate), to allow for the free flow <br />of water. <br />Enforce provisions under creek protection, stormwater <br />management, and discharge control ordinances <br />designed to keep watercourses free of obstructions and <br />to protect drainage facilities to confirm with the <br />Regional Water Quality Control Board's Best <br />Management Practices. <br />N <br />t� <br />V <br />c0 <br />n <br />W <br />N <br />0 <br />a <br />1 <br />N <br />0 <br />4- <br />R <br />a <br />co <br />
The URL can be used to link to this page
Your browser does not support the video tag.