My WebLink
|
Help
|
About
|
Sign Out
RES 06003
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 2:53:51 PM
Creation date
2/1/2006 4:40:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/17/2006
DOCUMENT NO
RES 06003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
slfelaa <br />Pleasanton Paratransit, <br />Logistics section planning <br />for vendors. Use trails as a <br />backup for emergency <br />responders <br />G <br />\t <br />3 <br />Public Works <br />Public Works <br />Public Works <br />Public Works <br />X <br />IT <br />x <br />Mitigation Strateav <br />Ensure that transit operators, private ambulance <br />companies, cities, and /or counties have mechanisms in <br />place for medical transport during and after disasters <br />that take into consideration the potential for reduced <br />capabilities of roads following these same disasters. <br />Effectively utilize the Transportation Management <br />Center (TMC), the staffing of which is provided by <br />Caltrans, the CHP and MTC. The TMC is designed to <br />maximize safety and efficiency throughout the highway <br />system. It includes the Emergency Resource Center <br />(ERC) which was created specifically for primary <br />planning and procedural disaster management. <br />1- b Earthquakes <br />Expedite the funding and retrofit of seismically- deficient <br />city- and county -owned bridges and road structures by <br />working with Caltrans and other appropriate <br />governmental agencies. <br />Establish a higher priority for funding seismic retrofit of <br />existing transportation and infrastructure systems (such <br />as BART) than for expansion of those systems. <br />Include "areas subject to high ground shaking, <br />earthquake- induced ground failure, and surface fault <br />rupture" in the list of criteria used for determining a <br />replacement schedule for pipelines (along with <br />imnnrtanre ane tvne of nnnstructinn material. size. <br />Install specially- engineered pipelines in areas subject to <br />faulting, liquefaction, earthquake- induced landsliding, or <br />other earthquake hazard. <br />Replace or retrofit water- retention structures that are <br />determined to be structurally deficient. <br />CO <br />
The URL can be used to link to this page
Your browser does not support the video tag.