My WebLink
|
Help
|
About
|
Sign Out
SR 06:012
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2007 1:12:32 PM
Creation date
1/13/2006 11:16:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/17/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />estimates and incremental construction strategies. Such options would allow the project to move <br />forward, and still provide time for the Pleasanton Cultural Arts Foundation to raise the necessary <br />additional funds. <br /> <br />The consultants have now updated the estimated building costs, assuming a construction start <br />date of November, 2006. They have also developed several Project Scenarios that would allow <br />for an incremental approach to the construction and funding of the project. These scenarios will <br />be formally presented to the Council at this evening's meeting. In addition, staff has developed <br />a very preliminary business plan for the facility, including initial cost estimates related to <br />operating the new facility and programming the art gallery. A rough estimate of the potential <br />costs to improve Lions Wayside Park and extend it to the perimeter of the Firehouse Arts Center <br />facility is also included. This assumes that the City will acquire the Alameda County <br />Transportation Corridor, which runs along the eastern boundary of the Arts Center. Actual or <br />projected costs of that acquisition are unknown at this time. <br /> <br />. Original Cost Estimate (April 2005 Estimate - construction start January '06) <br />(Please refer to Attachment A, Pleasanton Firehouse Arts Center Construction Estimate <br />Worksheet) <br /> <br />Original (April 2005) estimated costs for the project: <br /> <br />Amenity <br />A. Galleries <br />B. Theater <br />C. Theater equipment <br />D. Classrooms <br />E. Site improvements <br /> <br />Total Cost <br />$1,995,000 <br />4,250,000 <br />600,000 <br />898,000 <br />702,000 <br /> <br />Total <br /> <br />$8,445,000~ <br /> <br />~Does not include estimates for City/agency permit fees or construction contingency. <br /> <br />Please note: The original estimate prepared by the cost estimator was $8.444 million. The <br />additional $1,000 ($8.445 million) results from rearranging the costs into categories related to <br />the four (4) major facility amenities listed above and rounding to the nearest thousand. <br /> <br />. Revised Cost Estimate (construction start date November '06) <br />(Please refer to Attachment A, Pleasanton Firehouse Arts Center Construction Estimate <br />Worksheet) <br /> <br />The consultants have updated the estimated construction cost based upon a start date of <br />November 2006. The estimate reflects an assumed 7% escalation increase in construction costs. <br /> <br />SR 06:012 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.