Laserfiche WebLink
<br /> Lions Wayside Park PrelimInary 12.16.05 <br /> Pleasanton. CA Opinion of Probable Construction Costs <br /> SrhemaUcDesignStage <br /> Item QuantitY Unit UnIt Cost Total Subtotals Totals Comments <br />I. Mobilization, etc. <br />A. Misceil. <br /> I Staging, Job Office, etc. I LS 5,000.00 5,000 <br /> 2 Construction Fencing 1,600 LF 15.00 24,000 Temporary Fence <br /> 3 Traffic Protection at 3 Streets ILS 5.000.00 5.000 FIrst. Neal. & Railroad Streets <br /> 34.000 <br />B. Demo. <br /> I Demo Ex. Bldg., Bandstand, etc. ILS 10.000.00 10.000 <br /> 2 Remove Exist. Pltg., IITig, etc. I LS 10,000.00 10.000 As Req'd. for New Construction Only <br /> 3 Save Existing Trees I LS 10,000.00 10.000 2 Trees at $3.000: i Tree at $7,000 <br /> 30.000 <br /> Subtotal: Mobilization 64.000 <br />II. Grading & Drainage <br />A. Grading <br /> 1 Rough Grading 138.360 SF 0.25 34.590 Assumes on-slte cutlflll balance <br /> 34.590 <br />B. Drainage <br /> I AD's In Lawn 30 EA 350.00 10,500 Christy concr. Box with C.!. Grate <br /> 2 AD's in Planting -smalierareas 10 EA 200.00 2.000 <br />3 AD's in Paving 15 EA 350.00 5,250 <br /> 4 AD's in Planting - Mlscell. 10 EA 200.00 2,000 Chrbty concr. Box with C.I. Grate <br /> 5 Connection to City Storm 3 EA 20,000 60.000 Assumeconnexn. at exist. curb inlets <br /> 79,750 <br />C. Drain Lines <br /> 1 Drain line 1,000 LF 20.00 20,000 Incl. Clean-ours <br /> 2 Perforated Drain Line 300 LF 20.00 6,000 At retain. Walls <br /> 26.000 <br /> Subtotal: Grading & Drainage 140.340 <br /> <br />Richard Larson Associates <br />Land<cape Architecture Planning <br />Page 1 <br />