My WebLink
|
Help
|
About
|
Sign Out
SR 06:029
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2006 3:41:14 PM
Creation date
1/12/2006 3:10:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/17/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />diameter and 20 LF of 12" diameter water lines and necessary fittings. The work included <br />trenching through the Katz Winery, installing new water line and connecting it to the Ruby Hill <br />water line at Zenato Place. <br /> <br />BUDGET <br /> <br />Project funding, and expenditures are presented below. <br /> <br />Funding <br />Ruby Hill 16" water line, CIP 0410 14 <br />(Water Expansion Fund) <br /> <br />$250,000 <br /> <br />Estimated Expenditures <br />Construction Bid <br />Construction Contingency (20%) <br />Construction Services (Survey/GeoTech) <br />Total <br /> <br />$ 188,400 <br />$ 37,680 <br />$ 15.000 <br />$ 241,080 <br /> <br />Actual Expenditures <br />Construction Bid <br />Change Orders <br />Construction Services (Survey/GeoTech) <br />Miscellaneous (ads, reproduction) <br /> <br />Total <br /> <br />$188,400.00 <br />$ 9,652.78 <br />$ 14,152.75 <br />$221.08 <br />$212,426.61 <br /> <br />The change orders for $9,652.78 were due to repairs to an unknown underground water line <br />damaged during construction at the Katz Winery, delays due to working around grape harvesting <br />operations, and other miscellaneous additional expenses. <br /> <br />FISCAL IMPACT <br /> <br />This project will enhance the reliability of the City's water service to the Ruby Hill community <br />and the Katz Winery in the Vineyard Avenue Corridor. The project will add additional <br />infrastructure to the City's water system and result in a minimal increase in operating costs. <br /> <br />00~ <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />~/~. <br /> <br /> <br />Respectfully submitted, <br /> <br />Susan Rossi <br />Director of Finance <br /> <br />Nelson Fialho <br />City Manager <br /> <br />SR 06:029 <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.