Laserfiche WebLink
<br />3. Exhibit C: Draft Resolution and Negative Declaration/Initial Study <br />4. Location Map <br />5. Cross Section Study of Locations, Distances, Sight Lines, and Screening Effects for the <br />Existing Nassar Home (5531 Calico Lane) and Lot 9, Roselyn Lane Project <br />6. Public Comment Letters <br />7. Geotechnical Report, Hydraulic Evaluation and Bank Erosion Analysis of Arroyo del <br />Valle, prepared by Engeo, Inc., March 10,2005 <br />8. Engeo estimate for maintenance costs; fund reserves <br />9. Zone 7 Interim Design Standards and Practices for Future Construction and <br />Improvement of Channels, April 21, 1999 <br />10. Zone 7 Chronology <br />II. Tree Survey/Report, prepared by HortScience, Inc., September, 2004 <br />12. Noise Study, prepared by Illingworth & Rodkin, Inc., July 5, 1998 <br />13. Agency Permits <br />a. CRWQCB Bay Region, Permit 2198.11 <br />b. US Army Corps of Engineers, Permit 404 #29279S <br />c. CA Dept ofFish & Game, Permit 401 Streambed Alteration Agreement, <br />#1600-2004-0872-3 <br />14. Documentation related to negotiations from 2004-2005 with Jones Family <br />15. Planning Commission Staff Report, dated November 16,2005 <br />16. Excerpts from the Planning Commission Meeting, dated November 16,2005 <br />17. Letters from Mr. David Jones, dated December 9,2005 and December 12,2005 <br />18. Letter from Mr. Lynn Jansen, dated January 2, 2006 <br />19. 1995 Proposed Circulation Plans <br /> <br />SR 06:013 <br />Page 17 of17 <br />