My WebLink
|
Help
|
About
|
Sign Out
SR 06:005
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2005 9:58:54 AM
Creation date
12/27/2005 9:28:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/3/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF <br /> <br />-~ <br />' - ..........- .. . <br />-== _..', .11' III .;:i;; I <br /> <br />pLEASANTONc <br /> <br />SUB.JECT: <br /> <br /> <br />4G <br /> <br />City Council <br />Staff Report <br /> <br />January 3,2006 <br />Public "Works Department <br /> <br />AMENDMENT TO THE CONSULTANT CONTRACT "WITH <br />DODSON ENGINEERS FOR SPECIALTY INSPECTIONS FOR <br />THE VINEYARD CORRIDOR SANITARY SE"WER LIFT STATION <br /> <br />STAFF RECOMMENDATION: <br /> <br />SUMMARY: <br /> <br />SR 06:005 <br />Page 1 of" 3 <br /> <br />Staff recommends that the City Council take the f'ollowing action at the <br />meeting of' January 3, 2006: <br /> <br />10 Approve the attached professional services contract amendment. <br /> <br />2. Authorize the City Manager to execute the attached contract <br />amendment with Dodson Engineers 0 <br /> <br />30 Approve the appropriation of' an additional $31 ,831 065 from the <br />Vineyard A venue Corridor Specific Plan f'ees to include engineering <br />review and specialty inspections of the Vineyard Corridor sanitary <br />se~er lift station 0 <br /> <br />The City entered into a contract with Dodson Engineers to provide <br />specialty inspections f'or the Vineyard Corridor sanitary sewer lift station 0 <br />The subject consulting services consists of' engineering shop drawing <br />review and specialty construction inspection. Dodson Engineering has <br />provided these services on a time and materials basis, totaling <br />$58,460000, the original contract maximum 0 Funding f'or these services is <br />provided under terms of' a reimbursement agreement with Greenbriar <br />Homes, who is constructing the lift station in-lieu of paying Vineyard <br />Corridor Specific Plan f'ees. The construction of' the lift station has <br />exceeded the time originally proposed by the developer's contractor. In <br />order to provide the necessary inspections through completion of the <br />project, it is necessary to amend the contract with Dodson Engineers 0 <br />Additional consultant costs required to complete the lift station inspections <br />
The URL can be used to link to this page
Your browser does not support the video tag.