Laserfiche WebLink
<br />44. The project developer shall ensure that fire protection facilities. including all surface <br />roads, fire hydrants, and a water supply capable of fumishing the required fire flow <br />are installed and serviceable prior to and during the time of construction. When <br />altemate methods of protection are approved by the Fire Chief, this requirement may <br />be waived or modified. Proposed altemate methods of fire protection shall be <br />submitted, in writing, to the Fire Chief. Work on the altemative fire protection <br />methods shall not start without the approval of the Fire Chief. <br /> <br />45. The Fire Chief shall issue a permit prior to any installation of a fire detection. alarm, <br />and occupant notification system. All sprinkler system water flow and control valves <br />shall be complete and serviceable prior to final inspection. Prior to the occupancy of <br />a building having a fire alarm system, the Fire Department shall test and witness the <br />operation of the fire alarm system. <br /> <br />46. All portions of the building covered by this approval shall have installed and <br />operating, fire extinguishers with a minimum 2-A: 10-B:C rating. The fire <br />extinguishers shall be located within a seventy-five foot (75' 0") radius of each other. <br /> <br />47. All utilities required to serve any existing or proposed development on-site shall be <br />installed underground. <br /> <br />48. The project developer shall submit a refundable cash bond for hazard and erosion <br />control prior to issuance of an Engineering or Building Department permit, if <br />required. The amount of this bond will be determined by the City Engineer. <br /> <br />49. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />50. The project developer shall include erosion control measures on the grading plan, <br />subject to the approval of the City Engineer. The project developer is responsible for <br />ensuring that the contractor is aware of such measures. All cut and fill slopes shall be <br />revegetated and stabilized as soon as possible after completion of grading, in no case <br />later than October 15. No grading shall occur between October 15 and April 15 <br />unless approved erosion control measures are in place, subject to the approval of the <br />Building Department. Such measures shall be maintained until such time as <br />permanent landscaping is in place. <br /> <br />51. The project developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br /> <br />52. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br />dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owner(s). <br /> <br />53. Prior to building permit issuance. the developer shall submit a copy of the site, <br />grading, and drainage plans to Zone 7 for review of the project's consistency with <br /> <br />7 <br />