My WebLink
|
Help
|
About
|
Sign Out
RES 05067
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2005
>
RES 05067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2005 4:45:22 PM
Creation date
12/2/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/6/2005
DOCUMENT NO
RES 05067
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Zone 7 applicable guidelines for projects next to Zone 7 channels. The developer <br />shall incorporate any requested changes into the design of the project, subject to the <br />review and approval of the Planning Director. <br /> <br />54. The design of the water supply and sanitary sewer systems shall be subject to the <br />review and approval of the City Engineer. <br /> <br />55. Approval of the storm drainage system shall be subject to the review and approval of <br />the City Engineer to determine that the system is adequate. connects to an approved <br />point of discharge, and meets the immediate and long-range requirements of this <br />development. <br /> <br />56. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the project developer. This shall include slurry seal, overlay, or street reconstruction <br />if deemed warranted by the City Engineer. <br /> <br />57. The project developer's contractor(s) shall obtain an encroachment permit from the <br />City Engineer prior to moving any construction equipment onto the site. <br /> <br />58. The project developer shall pretreat storm water prior to reaching the storm drains to <br />the satisfaction of the City Engineer. The design, locations, and a schedule for <br />maintaining the filtering system shall be submitted to the City Engineer for review <br />and approval prior to issuance of building permits. <br /> <br />59. The project developer shall sweep or vacuum the parking lot and sidewalks a <br />minimum of once a month and shall prevent the accumulation of litter and debris on <br />the site. Comers and hard to reach areas shall be swept manually. If sidewalks <br />and/or the parking lot are pressure washed. debris must be trapped and collected to <br />prevent entry into the storm drain system. No cleaning agent may be discharged into <br />the storm drain. If any cleaning agent or degreaser is used, wash water must be <br />collected and discharged to the sanitary sewer, subject to approval of the Dublin-San <br />Ramon Services District (DSRSD). <br /> <br />60. The project developer shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site <br />storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Director of Building Inspection. <br /> <br />61. Prior to the commencement of any clearing, grading, or excavation, the project <br />developer shall submit a copy of the State Water Resources Control Board Notice of <br />Intent (NOI) for coverage under the State Construction Storm Water General Permit. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.