Laserfiche WebLink
<br />iiL Side""alks and the parking lot shall be s""ept reg;t...l-larly to prevent the accumulation <br />of litter arid debris_ If pressure ""ashed,.. debris must be trapped arid collected to <br />prevent entry into the storm drain system. No cleaning agent may be discharged to <br />the storm drain_ <br /> <br />iv. All on-site storm drains shall be clearied at least tvvice a year,.. once immediately <br />prior to the rainy season (October 15) and once in Jariuary. <br /> <br />v _ Construction site clean-up and control of construction debris shall be addressed in <br />the plari. 1'Vleasures to be follo""ed include gathering construction debris and <br />placing it in a dumpster or container on a regular basis,.. creating a contained and <br />covered area on. the site for the storage of materials such as cement and paint <br />""hieh have the potential for being discharged into the storm drain system by vvind <br />or spillage,.. and ensuring that cement trucks,.. painters,.. or stucco/ plaster finishing <br />contractors do not discharge vvash ""ater from equipment,.. tools or rinse containers <br />into street gu.tters or drains. <br /> <br />55_ All site improvements shall be limited to the hou.rs of8:00 a_m_ to 5:00 p_m.,.. 1'Vlonday <br />throu.gh Saturday. All construction equipment must: meet: D1'VlV noise standards arid shall <br />be equipped ""ith muming devices. <br /> <br />15 <br />