My WebLink
|
Help
|
About
|
Sign Out
SR 05:310
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2005 2:53:55 PM
Creation date
12/1/2005 2:41:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:310
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The total budget identified in the February 2005 staff report (shoW'n in table beloW') did <br />not include the design cost of the project. Staff recommends transferring the design <br />cost of $17,690.00 from CIP 045054 Installation of Traffic Signals at Various <br />Locations into CIP 055006 Bernal and Fire Station NO.4. <br /> <br />Bernal @ Fire Station 4 Initial Cost Estimate <br /> <br />EXPENDITURES CIP 055006 <br />City Purchased Equipment $38,512.73 <br />Construction Bid $137,424.00 <br />Surveving Services $2,000.00 <br />Geotechnical Services $2,000.00 <br />Contingency $20,615.00 <br />ESTIMATED CONSTRUCTION TOTAL $200,551.73 <br /> <br />In addition to the design cost, staff recommends the transfer of $3,001.96 from CIP <br />045054 Installation of Traffic Signals at Various Locations into CIP 055006 Bernal and <br />Fire Station No. 4 to fund the additional inspection and fiber testing services that W'ere <br />not anticipated in the initial construction cost estimate. The detailed cost breakdoW'n for <br />the project is shoW'n in the table below. <br /> <br />Bernal @ Fire Station 4 Final Cost Breakdown <br /> <br />City Furnished Equipment $39,697.01 <br />Construction Bid $137,424.00 <br />Surveying Services $13,017.57 <br />Geotechnical Services $10,041.30 <br />Contingency $2,822.08 <br />TOTAL -- CONSTRUCTION $203,001.96 <br />Design $17,690.00 <br /> <br />SR 05:310 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.