Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />NOVEMBER 17, 2005 <br /> <br />~ . SCOPE OF WORK <br /> <br />2.3.4. Catalog of Existing Facilities - Bellecci will prepare a catalog of <br />existing utilities, which is standard for our roadway design projects. <br />We have found this to be a time efficient way of tracking existing <br />facilities. First we take a separate photo of all surface evident <br />facilities within the limit of work. Each facility is numbered, and the <br />action of work for each facility is explained on a spreadsheet. After <br />completion of the Catalog of Existing Facilities, the spreadsheet <br />can be added to the plans. <br /> <br />3. PRELIMINARY ENGINEERING <br /> <br />3.1. Preliminary Plans <br /> <br />3.1.1. Preliminary Design - CONSULTANT will prepare at 20 scale, a <br />preliminary design that reflects all proposed improvements and <br />modifications as evaluated through the process thus far. The plan <br />will identify in a the proposed intersection geometry, pavement <br />delineation, median configurations, striping, crosswalk location and <br />treatment, landscape and irrigation notes, bus stops, traffic <br />channelization, and other information as deemed appropriate by the <br />design team. A preliminary cost analysis will be furnished to <br />accompany the design for evaluation of proposed improvements <br />and modifications. These plans may include preliminary <br />construction details, materials and/or product manufacturers, <br />catalog cut sheets. The intent of this package is to establish the <br />"design intent" that will be incorporated throughout the project. <br /> <br />3.1.2. Develop Key Typical Section - CONSULTANT will prepare cross <br />sections of the proposed improvements. The cross section will <br />reveal total limits of roadway excavation, hardscape, landscape, <br />horizontal locations travel lanes, and proposed median <br />improvements. <br /> <br />3.2. Right of Way - CONSULTANT will show existing right of way on the <br />project base map. Our understanding is that the right of way for this <br />project is already determined and is available on CAD. We also <br />understand that this project will not require right of way acquisition. <br /> <br />3.3. Stakeholders Meeting - The City will hold an informational public <br />meeting to present the City Council Approved Design and the <br />construction time line. <br /> <br />4. 500/0 SUBMITTAL <br /> <br />~ <br /> <br />BELLECCI & ASSOCIATES. INC <br /> <br />CIVIL ENGlNBBIUNG. LANDPLANNlNG. LANDSL~ <br />