Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD TRAFFIC CIRCLES <br /> <br />EXHIBIT A: SCOPE OF WORK <br /> <br />preliminary cost analysis will be furnished to accompany the design <br />for evaluation of proposed improvements and modifications. <br /> <br />2.1.2. Develop Key Typical Section - CONSULTANT will prepare cross <br />sections of the proposed improvements. The cross section will <br />reveal total limits of roadway excavation and improvements. <br /> <br />2.1.3. Preliminary Geometry Revie,^, - CONSULTANT will meet with <br />CITY and present the proposed geometry. CONSULTANT will be <br />responsible for meeting ager;nda, presentation of the preliminary <br />design, meeting minutes and revisions to the roadway design per <br />comments from the meeting. <br /> <br />2.2. Right of Way - CONSULTANT will show existing right of way on the <br />project base map. Our understanding is that the right of way for this <br />project is already determined and is available on CAD. We also <br />understand that this project will not require right of way acquisition. <br /> <br />3. 500/0 SUBMITTAL <br /> <br />The purpose of this project is to perform the detailed design, obtain design <br />approval, and produce the construction drawings, special provisions, and <br />construction estimates required for the construction documents. The construction <br />documents will cover the work necessary to bid, construct, and put into operation <br />the proposed facilities. <br /> <br />The plans, specifications and estimates are to be prepared in accordance with <br />the latest City of Pleasanton Standard Plans and Specifications and <br />supplemented by Caltrans standards. Work not covered by these "manuals" shall <br />be designed in substantial conformance with accepted professional standards. <br /> <br />Consultant shall prepare plans, specifications, and estimates for removal of the <br />traffic circles on Vineyard to be replaced with conventional roadway design in <br />conformance with industry standards. The plans should include civil engineering <br />items and signing & striping. We assume no electrical engineering nor <br />landscape is needed. <br /> <br />CONSULTANT will prepare detailed Engineer's Estimates for the project, <br />including construction cost, and right-of-way acquisition cost. Detailed estimates <br />shall be prepared and submitted with review PS&E and 50%>, 950/0 and 1000/0 <br />completion. The project shall be designed using units in United States Standard <br />Measures (English Units). Construction specifications shall be provided for work <br />undertaken in this project. Final Specifications shall be written on Microsoft <br /> <br />NOVEMBER 10, 2005 <br /> <br />BELLECCI & ASSOCIATES <br />