My WebLink
|
Help
|
About
|
Sign Out
SR 05:301 (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:301 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2005 3:53:30 PM
Creation date
10/28/2005 11:49:22 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/1/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:301(2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PHASE II CIRCULATION SYSTEM IMPROVEMENTS <br />Due to the extensive circulation system improvements that were constructed in conjunction with <br />Phase I development, a relatively limited extent of improvements will be necessary to <br />accommodate future Phase II Area development. Phase II improvements will include widening <br />Bernal Avenue along its southern edge through the eastern portion ofthe Phase II Planning Area <br />to accommodate a six-foot wide bicycle lane, a new collector street connecting Pleasanton <br />Avenue at Bernal Avenue south to Valley Avenue, traffic roundabouts, bus stops, trails and trail <br />heads, a potential pedestrian tunnel under 1-680, and a potential park-and-ride commuter parking <br />lot. Policy guidance relating to these facilities is provided below. <br />TRANSPORTATION OBJECTIVES, POLICIES AND GUIDELINES <br />Circulation Svstem Coordination <br />TO ESTABLISH A COORDINATED SYSTEM OF PHASE I AND II STREETS THAT <br />PROVIDES CONVENIENT TRAFFIC CIRCULATION AND IS INVITING AND SAFE FOR <br />PEDESTRIANS AND BICYCLISTS. <br />Circulation System Policy 1: Consistency Between Land Use and Circulation. Locate and <br />design street improvements and as shown on Figure 5-1 (Circulation Diagram) to be consistent <br />with the needs oftraffic generated by both Phases I and II. <br /> Guidelines: <br />1.1 Use the street network and available capacities disclosed in the Bernal Property Phase II <br /> Specific Plan EIR when planning development to ensure that circulation facilities remain <br /> adequate. <br />1.2 Provide street improvements as described in this Specific Plan to maintain an acceptable <br /> level of service at all Bernal Property intersections and roadway segments as proj ects <br /> develop. Planned improvements as set forth in this Specific Plan will support traffic <br /> generated within the Planning Area at LOS "D" or better. Timely construction of these <br /> improvements will ensure there will be no interim LOS "E" or worse congestion.) <br />Circulation System Policy 2: On-Site Street Standards. Design and improve the new <br />Pleasanton Avenue section to a different standard than typical City requirements for a collector <br />street in an attempt to reduce or eliminate the functional and visual dominance of the street. <br /> Guidelines: <br />2.1 Design Pleasanton Avenue consistent with the roadway section standards shown on <br /> Figure 5-2 (Pleasanton Avenue Section Diagram). <br />Administrative Draft, Bernal Property Phase II Specific Plan, October 25, 2005 Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.