Laserfiche WebLink
122. <br /> <br />BMP may result in the issuance of correction'notices, citations, or a <br />stop work order. <br /> <br />The project developer is responsible for implementing the following <br />measures during all construction phases of the project: <br /> <br />ao <br /> <br />Gather all consmaction debris on a regular basis and place it <br />in a dumpster or other container which is emptied or removed <br />on a weekly basis. When appropriate, use tarps on the ground <br />to collect fallen debris or splatters that could contribute to <br />storm water runoff pollution. <br />Remove all dirt, gravel, rubbish, refuse, and green waste from <br />the street pavement and storm drains adjoining the site. Limit <br />construction access routes onto the site and place gravel on <br />them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street <br />pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping. <br />Install filter materials (such as sandbags, filter fabric, etc.) at <br />the storm drain inlet nearest the downstream side of the <br />project site in order to retain any debris or dirt flowing in the <br />storm drain system. Maintain and/or replace filter materials <br />to ensure effectiveness and to prevent street flooding. <br />Create a contained and covered area on the site for the storage <br />of bags, cement, paints, oils, fertilizers, pesticides, or other <br />materials used on the site that have the potential of being <br />discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br />Never clean machinery, equipment, tools, brushes, or rinse <br />containers into a street, gutter, or storm drain. <br />Ensure that concreteYgunite supply tracks or concrete/plaster <br />operations do not discharge wash water into street, gutters, or <br />storm drains. <br /> <br />Development Plan Lapsing <br /> <br />123. <br /> <br />This development plan shall be of no further validity and the project <br />developer shall be required to submit the same or new development plan for <br />City approval prior to development of the site in the event that the project <br />developer fails to record a final map within two (2) years of this PUD <br />Development Plan approval. Portions of the development plan not covered <br /> <br />Conditions of Approval for PUD-6, Centex Homes' Avignon Project <br />City Council Meeting, June 5, 2001 Page 33 <br /> <br /> <br />