Laserfiche WebLink
separator shall be submitted to the City 'Engineer/Director of <br />Building Inspection for review and approval prior to issuance of <br />building permits. The structural control shall be cleaned at least <br />twice a year: once immediately prior to October 15 and once in <br />January. The project developer shall enter into a maintenance <br />agreement for the oil/water separator. <br /> <br />117. <br /> <br />Bulk construction materials stored outdoors that may contribute to <br />the pollution of storm water runoff shall be covered as required by <br />the City Engineer and/or the Director of Building Inspection. <br /> <br />118. <br /> <br />The project developer shall label all on-site storm drain inlets with <br />the wording, "No Dumping -- Drains to Bay" using City-approved <br />methods and materials. On-site storm drain facilities shall be <br />cleaned a minimum of twice a year as follows: immediately prior to <br />October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Director of <br />Building Inspection. <br /> <br />119. <br /> <br />Prior to the commencement of any clearing, grading, or excavation, <br />the project developer shall submit a copy of the State Water <br />Resources Control Board Notice of Intent (NOI) for coverage under <br />the State Construction Storm Water General Permit. <br /> <br />120. <br /> <br />All cut and fill slopes shall be revegetated and stabilized after <br />completion of grading before October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary <br />irrigation system to ensure that the grasses are established before <br />October 15. No grading shall occur between October 15 and April <br />15 unless approved erosion control/storm water quality measures are <br />in place, subject to the approval of the City Engineer/Director of <br />Building Inspection. Such measures shall be maintained until such <br />time as permanent landscaping is place. <br /> <br />121. <br /> <br />The project developer shall submit a construction Best Management <br />Practices (BMP's) program for review and approval by the Planning <br />Director prior to issuance of building and/or grading permits. These <br />BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. <br />Construction site cleanup and control of consmaction debris shall <br />also be addressed. Failure to comply with the approved construction <br /> <br />Conditions of Approval for PUD-6, Centex Homes' Avignon Project <br />City. Council Meeting, June 5, 2001 Page 32 <br /> <br /> <br />