My WebLink
|
Help
|
About
|
Sign Out
ORD 1830
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
7/20/2001 3:48:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1830
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39. <br /> <br />40. <br /> <br />41. <br /> <br />42. <br /> <br />43. ' <br /> <br />dated June 23, 2000, and "Response to G-eoteclmical Peer Review by ENGEO, <br />Inc." dated January 10, 2001. The developer's geotechnical ¢onsuitant shall <br />review and approve all foundation~ wall, drainage, and geotechnical <br />aspects of the final development plans to ensure that the recommendations have <br />been properly incorporated into the development. The consultant shall certify by <br />writing on the plans or as otherwise acceptable to the Director of Building <br />Inspection that the final development plan is in conformance with the <br />geotechnical report approved with the project. <br /> <br />The developer shall arrange and pay for the geotechnical consultant to inspect and <br />approve all foundation, retaining wall, and drainage geotechnical aspects of <br />project construction. The consultant shall be present on site during grading and <br />excavation operations. The results of the inspections and the as-built conditions <br />of the project shall be certified in writing by the geotechnical consultant for <br />conformance to tbe approved plans and geotechuical report and submitted to the <br />City Engineer and Director of Building Inspection for review and approval prior <br />to occupancy. <br /> <br />Final Parcel Man Reauirements <br /> <br />Prior to approval of the minor subdivision, the applicants shall modify/create a <br />joint maintenance agreement for the existing and proposed access <br />roads/driveways. The agreement shall be subject to review and approval by the <br />City-Attorney prior to r~cordation of the final parcel map. The access road and its <br />storm drain system shall be maintained to the satisfaction of Fire Department and <br />City Engineer. The City shall have the right to maintain the access road in a <br />manner satisfactory to its standards should the property owners fail to do so and <br />the City shall have the right to assess the applicants for any costs incurred in such <br />maintenance. <br /> <br />Prior to approval of the minor subdivision' the applicants shall modify existing <br />and/or create new access easements for the new lots over the existing and <br />proposed access roads. The agreement shall be subject to review and approval by <br />the City Attorney prior to recordation of the final parcel map. <br /> <br />Prior to approval of the minor subdivision, the applicants shall modify existing <br />and/or create new easements and maintenance agreements to ensure satisfactory <br />operation/maintenance/repair of the private sewer and water lines by all users. <br />The easements/agreements shall be subject to review and approval by the City <br />Attorney prior to recordation of the final parcel map. <br /> <br />Prior to approval of the minor subdivision, the applicants shall create a landslide <br />repair easement/agreement that v~uld allow proper~y owners in the project to <br />aec~ss and repair landslides on an adjacent property.in the project. The <br />easement/agreement shall be 'subject to revieTM and approval by the City Attorney <br />prior to recordation of the final parcel map. Any landslide repairs shall be <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.