My WebLink
|
Help
|
About
|
Sign Out
SR 05:304
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2005 3:22:01 PM
Creation date
10/20/2005 3:04:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT NO
SR 05:304
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> EDAW INe WOR~, PROGRAM <br /> TRANSIT.O'<:IENTED SPECIFIC PLAN <br /> FOR THE Hf,CI=NDA BUSINESS PARK <br /> documents. The imp;1Ct analysis of Specific Plan <br />. JD franz Research, Inc will conduct;l survey traffic will be conducted for two future development <br /> to gather statbtically valid information on horizon year scenarios. <br /> travel behavior deemed to be imporlan: but <br /> missing at tht' end of PhJse lA. This could We will identify traffic impacts based on the <br /> include questions regarding the efficacy of significance criteri;~ agreed to by the City. Mitigation <br /> individual alternative tran::.portatior services measures will be identified for impacts that exceed the <br /> th(lt may be implemented in conjunction with thresholds of esti'lblished significance criteria. These <br /> the HBP TOO plan, e.g. transit options measures will emphasize travel demand management <br /> (feeder buses/shuttles), w<1lkwJY and and effective alternJtives to automnbile. <br /> bikeway improvements, and parkin:~ <br /> controls/ pricing. Fehr & Peers will consult with EDA W in the <br /> development of evaluate the project circulation plan, <br />The Phase "I B scope of work also includes up to three including implementation of alterni'ltive <br />additional meetings with City and HBP staff and other transportation facilities and travel demand measures, <br />consultants to describe the findings oJ this phase. and provide one set of recommendations for the initial <br /> plan's site access and circulation. <br />Phase 1 includes preparation of J memorandum Fehr & Peers will assist the project team in <br />summiHizing our i'lnalysis approJch and results. The formulating project i'llternatives, and will qualitatively <br />memo will also specify steps through which the evaluate up to two alternatives to determine whether <br />resulting relationships between TOD and vehicle trip they would lessen or eliminate the significant impacts <br />generation should be implemented in conjunction identified for the proposed project. This evaluation <br />with the City of Pleasanton's traffic forecasting model will be based on a comparison of the relative trip <br />for the Specific Plan. generation characteristics of the alternatives. This <br /> evaluation will form thl' basis for the CEQ^ analysis <br />The rl'sult nf Phase I will be a method that fairly of the Specific Plan. <br />represents the vehicle trip reduction benefits of lOU <br />that can be used for general level planning and For the final Specific Plan, Fehr and Peers will make <br />comparative evaluation land use altcrnative~;. Under detailed recllmmendations regarding needed <br />this proposed work scope, the trip generatio:l formula transportation and parking facilities for all travel <br />will be developed in a form that allmvs for modes. Cost estimates for these recommended <br />straightforward modification or post..proces:;ing of the mitigation measures will also be developed <br />City 01 Pleasanton's traffic forecasting model results to <br />predict changes in trip generation resulting from TOO Fehr and Peers Optional Tasks: <br />development levels within Ilacienda Business Park <br />Beyond this contract, the methodology can te Public Meetinqs <br />integrated with the City's standard modelin:~ <br />procedures to allow it to be used in all TOO As an optional task, one Fehr & Peers staff <br />devdl1pment trnffic impact analysE'S. member "V ill attend up to two public meetings <br />The Phase 2 work scope will focus on implementation (c.g., Planning Commission, City Council, public <br />steps: hearing) regarding the project. The cost for this <br /> task is listed separately in the cost estimate. <br />Summarize of Existing and Future Trans:g!lJgtion <br />Conditions: Using the City of P1easanton traffic model Optional Task: Assist with Response to <br />and other available data, we will determine thl' Comments <br />relevant transportation conditions under ex'sting iJ.:, <br />well as future conditions, with and without thE As an optional task, Fehr & Peers will assist in <br />I Iacienda Business Park TOO Specific Plan. Fehr & formulating responses to the public comments <br />Peers will coordinate with the City to identify received on the Draft EIR. The level of effort required <br />appropriate criteria for measuring the significance uf for this task will depend on the number and <br />project impacts. The criteria will be based on policies magnitude of comments received; therefore, if this <br />of thl' General Plan and other regional planning task i:; desired, a separate cost estimate will be <br /> C':~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.