Laserfiche WebLink
<br /> EDAW INC WORK PROGRAI.1 <br /> Tf'~AI,S'T OFIEt-lTED SPECIFIC PLAN <br /> FOR THE: HACIENDA BUSINESS PARK <br />will establish ,111 outline of goals to be included in EDA W will record the approximate height ,md <br />the Plan itself. density, number of stories, and building types, and <br /> identify historical or architecturally signifiGmt <br />The purpose of this assignment wiLl be to e~:tablish structures. <br />a series of criteria used to measure the progress and <br />success of the process and Plan. <br />TASK 3 - EXISTING CONDITIONS <br />ANALYSIS: BACKGROUND REPORT <br />3. A Existing Land Use and Public Policy <br />We will conduct an initi,d review of the local <br />planning policy context. A significant policy <br />framework currently exists to guide development <br />projects within the Plan ilrea, through an e):isting Land Use Analysis for BART, Eastern Contra Costa County <br />pun <br /> An important element of this assessment will <br />These policies address job growth.. housing, urban include a summary of the public realm within and <br />design, transportation, recn~ation and community abutting the Plan Area. This assessment will <br />revitalization. Specifically, we will addrcs~,: provide an overvie"v of the character of public <br /> spaces, including streets, sidewalks, and any formal <br />. Current land uses; or informal open spaces or public gathering areas. <br />. Vacant and. underutilized parcels; <br />. Parcel sizes; 3.C. Stakeholder InterViews <br />. Easements and! or deed restrictions; <br />. Land O\vnership patterns; During this vvork task vve will conduct individual <br /> or smCill group interviews witn identified key <br />. Approved and proposed projects (in the stakeholders within the Plan Area. It will be <br /> plan area and environs); important to include a fairly broad cross section of <br />. Relevant General Plan policies; participants during these interviews. <br />. Applicable development standards, zoning <br /> codes and other ordinances; and In addition to the Core Planning Area Team, other <br />. Other relevant Specific Pl,lIl.5 and propeIty owners ancllocal developers, interviewees <br /> ordinances specifically prepared tl) address snould also include representatives from various <br /> the Plan are(\ City and BART departments, particularly staff <br />3. B. Building Stock Characterization and Urban members who "vill ultimately implement the plan; <br /> and p',-lblic works officials who can offer insights <br />Design Assessment regarding street design, clarifications regarding <br />ED^ W will conduct an analysis of the exi~,ting pedestrian and bicycle improvements, utilities, <br /> casements, street tree planting policies, and rights- <br />building stock and the Plan Area's urban design of-\ivay, and who may offer recommendations for <br />characteristics. We will drive, wdlk, anc the preparation and content of design guidelines. <br />photograph the Plan Area to identify distinctive <br />characteristics of the urban landscape, including the EDA \V will attend (,01ch at these interviews, and <br />character of development in the Plan and adjacent key Consultant Team members will attend <br />areas, landmarks nodes and ~atevvays} and overall interviews directly relevant to tr.eir area of <br />built form. We will also refer to ;'Iny relev,mt expertise. <br />existing information. <br /> 0-) <br />