My WebLink
|
Help
|
About
|
Sign Out
ORD 1826
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
4/13/2001 5:27:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/20/2001
DOCUMENT NO
ORD 1826
DOCUMENT NAME
MARDEL LLC
NOTES
VINEYARD
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not covered by a final map within two (2) years will have the development plan lapse as <br />to that portion of the project. <br /> <br />12. <br /> <br />The project developer acknowledges that the City.of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the project developer agrees and acknowledges that building permit ap- <br />proval may be withheld if sewer capacity is found by the City not to be available. <br /> <br />13. <br /> <br />This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. Notwith- <br />standing the project developer's participation in such a program, the City may withhold <br />building permits if the City determines that sufficient water is not available at the time of <br />application of building permits. <br /> <br />Planning Requirements: <br /> <br />14. <br /> <br />Prior to the demolition of any existing structure located on the Costas and Hahner proper- <br />ties, the project developer shall have the structures examined for the presence of lead, <br />lead-based paint, and/or asbesfos by a qualified environmental professional. If lead <br />and/or asbestos are found to be present, demolition of these structures shall be conducted <br />in accordance with the applicable requirements of the California Department of Industrial <br />Relations (Cai-OSHA) for lead, and Cai OSHA and the Bay Area Air Quality Manage- <br />ment Board (BAAQMD for asbestos. The project developer shall provide to the Planning <br />Director a follow-up report within thirty (30) days after demolition of the structures is <br />completed. <br /> <br />15. <br /> <br />Prior to the demolition of any existing structure located on the Costas and Hahner proper- <br />ties, the project developer shall have the structures examined for the presence of bats. <br /> <br />16. <br /> <br />The project developer shall pay one-half of the non-school funded (reimbursed by the <br />State of California) cost of the loop road, which is located on the west, south, and east <br />sides of the adjoining public school. If this project developer constructs the entire loop <br />road first, the project developer shall be eligible for reimbursement for the portions of <br />road not their responsibility. <br /> <br />17. <br /> <br />As specified by the Vineyard Avenue Corridor Specific Plan, the project developer shall <br />provide an open space management plan for Parcels "C" and "D" as part of the Tentative <br />Subdivision Map application for review and approval by the Planning Commission. The <br />plans shall address agricultural operations and wildlife and vegetation preservation needs. <br /> <br />PUD-O0-O1 (Ci~ Council approval) Page 5 of 28 March 7, 2000 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.