Laserfiche WebLink
78. <br /> <br />The applicants shall include erosion control measures on the final grading plan, <br />subject to the approval of the City Engineer. The applicants are responsible for <br />ensuring that the contractor is aware of such measures. All cut and fill slopes shall <br />be revegetated and stabilized as soon as possible after completion of grading, in no <br />case later than October 15. No grading shall occur between October 15 and April <br />15 unless approved erosion control measures are in place, subject to the approval <br />of the Building Department. Such measures shall be maintained until such time as <br />permanent landscaping is in place. <br /> <br />79. <br /> <br />The developer shall submit a dust control plan or procedure as part of the <br />improvement plans. Said plan shall be subject to review and approval by the <br />Planning Director and City Engineer. Gray water shall be used for dust control or <br />grading activities. This water may be obtained from the Dublin San Ramon <br />Services District (DSRSD) Waste Water Treatment Plant at 7399 Johnson Drive, <br />Pleasanton, unless otherwise approved by the City Engineer. <br /> <br />80. <br /> <br />Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of <br />a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owners. <br /> <br />81. <br /> <br />The design of the water supply and sanitary sewer systems shall be subject to the <br />review and approval of the City Engineer. <br /> <br />82. <br /> <br />Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Depadment of Fish and Game, and meets the <br />immediate and long-range requirements of this development and all upstream areas <br />intended to be drained through this development. <br /> <br />83. <br /> <br />Electric power distribution, gas distribution, communication service, Cable <br />television, and any required alarm systems shall be installed underground. <br /> <br />84. <br /> <br />Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the developer. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. <br /> <br /> <br />