My WebLink
|
Help
|
About
|
Sign Out
SR 05:294
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 3:05:00 PM
Creation date
10/13/2005 2:53:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/18/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:294
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. Installation of entry and median islands on Montevino Drive as shown <br />on Attachment A <br />2. Installation of entry and median islands on Crestablanca Drive as <br />shown on Attachment B <br />3. Modification of Vineyard Avenuel Montevino Drive intersection to <br />increase capacity as shown on Attachment C <br />4. Modification of Bernal Avenuel Tawny Drivel Vineyard Avenue <br />striping as shown on Attachment D <br />5. Conversion of Sauterne Way to a One-way street allowing southbound <br />access as shown on Attachment E. If approved, staff will develop a <br />recommended design to implement the conversion. <br />6. Installation of high visibility crosswalk signs on Vineyard Avenue <br />approaching Sauterne Way and Touriga Drive <br />7. Resurfacing of Vineyard A venue with a surface to reduce traffic noise <br />8. Direct staff to study and develop a traffic simulation of Vineyard <br />A venue lane reduction <br />9. Direct staff to submit additional landscape medians on Vineyard <br />Avenue for consideration with the next CIP funding cycle (2001- <br />02/2002-03). <br />1O.Direct staff to determine feasibility of raised island for Smoke Tree <br />Commons, as part of Bernal Avenue Capital Improvements <br />1l.Appropriate $10,000 from the General Fund to increase the Traffic <br />Calming Budget in Fiscal 2000/01. (If the conversion of Sauterne <br />Way is approved, additional funds may be needed depending on the <br />design chosen to implement the conversion.) <br />Mitigation Measures 1 & 2 <br />The construction cost of the first three median islands was $51,000. Construction bids for the <br />last two islands were over $30,000 per island. As the first three islands had little affect on <br />vehicle speeds or volumes, the residents at the last two neighborhood meetings agreed that <br />remaining funding should be allocated towards Vineyard Avenue improvements and that the <br />last two islands could be striped instead of raised medians. <br />Mitigation Measures 3 through 6 - Completed <br />Mitigation Measure 7 <br />The resurfacing of Vineyard Avenue has not been completed. The resurfacing is schedule for <br />Spring 2004, after completion of the Bernal Avenue bridge at Arroyo Del Valle and the <br />completion of a new water line project along Vineyard Avenue later this year. <br />Mitigation Measure 8 - Completed <br />X:\ADMIN\PGGS\Council 2005\MEETINGl00405\SR 05 276 Attachment1.doc <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.