Laserfiche WebLink
<br /> 1. Installation of entry and median islands on Montevino Drive as shown <br /> on Attachment A <br /> 2. Installation of entry and median islands on Crestablanca Drive as <br /> shown on Attachment B <br /> 3. Modification of Vineyard Avenue/ Montevino Drive intersection to <br /> increase capacity as shown on Attachment C <br /> 4. Modification of Bernal Avenuel Tawny Drivel Vineyard Avenue <br /> striping as shown on Attachment D <br /> 5. Conversion of Sauterne Way to a One-way street allowing southbound <br /> access as shown on Attachment E. If approved, staff will develop a <br /> recommended design to implement the conversion. <br /> 6. Installation of high visibility crosswalk signs on Vineyard Avenue <br /> approaching Sauterne Way and Touriga Drive <br /> 7. Resurfacing of Vineyard A venue with a surface to reduce traffic noise <br /> 8. Direct staff to study and develop a traffic simulation of Vineyard <br /> A venue lane reduction <br /> 9. Direct staff to submit additional landscape medians on Vineyard <br /> Avenue for consideration with the next CIP funding cycle (2001- <br /> 02/2002-03). <br /> 1O.Direct staff to determine feasibility of raised island for Smoke Tree <br /> Commons, as part of Bernal A venue Capital Improvements <br /> 1l.Appropriate $10,000 from the General Fund to increase the Traffic <br /> Calming Budget in Fiscal 2oo010I. (If the conversion of Sauterne <br /> Way is approved, additional funds may be needed depending on the <br /> design chosen to implement the conversion.) <br /> Mitigation Measures I & 2 <br /> The construction cost of the first three median islands was $51 ,000. Construction bids for the <br /> last two islands were over $30,000 per island. As the first three islands had little affect on <br /> vehicle speeds or volumes, the residents at the last two neighborhood meetings agreed that <br /> remaining funding should be allocated towards Vineyard Avenue improvements and that the <br /> last two islands could be striped instead of raised medians. <br /> Mitigation Measures 3 through 6 - Completed <br /> Mitigation Measure 7 <br /> The resurfacing of Vineyard Avenue has not been completed. The resurfacing is schedule for <br /> Spring 2004, after completion of the Bernal Avenue bridge at Arroyo Del Valle and the <br /> completion of a new water line project along Vineyard Avenue later this year. <br /> Mitigation Measure 8 - Completed <br /> X:\ADMIN\PGGS\Council2005\MEETINGlO0405\SR 05276 Attachmentl.doc <br /> Page 3 <br />