My WebLink
|
Help
|
About
|
Sign Out
SR 05:276
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 12:44:11 PM
Creation date
9/30/2005 3:06:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/4/2005
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> wanted to take the opportunity prior to completion of improvement plans to <br /> review with the Council the proposed roundabout design. <br /> Honorable Mayor and Members ofthe City Council: <br /> BACKGROUND <br /> The approved specific plan for the Bernal Development includes the extension of Valley Avenue <br /> south of Bernal Avenue. The northern portion of the new Valley Avenue will have one through <br /> lane in each direction and a wide landscaped median. Some of the intersections along Valley <br /> Avenue will be typical intersections with left turn pockets and 2-way stop sign control on the side <br /> streets and major commercial driveways. Four of the intersections along Valley Avenue are <br /> being designed as Traffic Roundabouts with landscaped center islands. <br /> - Roundabout Locations <br /> , <br /> The approved Bernal specific plan included three roundabouts on the new section of Valley <br /> Avenue. To improve overall traffic safety and calm traffic as it enters the residential and <br /> commercial area, the design of the roadway has been modified to add a fourth roundabout at the <br /> northernmost commercial driveway. <br /> SR:01:171 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.