Laserfiche WebLink
<br />PROPOSED AMENDMENT NO.1 TO THE 1986 EXPENDITURE PLAN <br /> <br />Thus. pursuant to the enabling legislation of Measure B, under Public Utility Code Sections <br />] 3 ] 304 and ] 31 050, which allows for the Authority to add, delete a project, or to make changes <br />of major significance, it is proposed that an amendment to the] 986 Expenditure Plan be <br />approved to reflect the following: <br /> <br />]. Delete references to tbe Route 238 Project currently in the project description in the <br />Expenditure Plan's Essential Transportation Project List as follows: <br /> <br />Project: <br />Cost: <br />Sponsor: <br /> <br />Route 238 and Route 84 <br />U54 ill million <br />Caltrans <br /> <br />Sales tax contribution.. $H4 $67 million <br /> <br />Description: <br /> <br />Route 238 {Mission Boulevard! will be built as a six lanejiceMk),'e:<p/=May <br />a!8J1K FlJ8t-l1il! ani .JJis3ilJl[ B8wle Mlvl ttJ .tndmt. fa.' ,'la/,nl 4J. T,,,m (,'.a e <br />roadwav from Industrial Par/ovay' to Route 84 near Decato Road. ,eJl.i3/illg <br />MfssiBII Hi,d. .~i.'l he ,.id-wed ta six lam:s /0 eristing Ratite 8f. Route 84 wjl/ <br />then be built along a previously adopted alignment where rights of way have <br />been acquired to intersect willi 880. <br /> <br />Note: Although the new Route 84 will likely intersect Route 238 somewhere <br />north of Peralta Avenue. the six lane conventional road is intended to extend <br />to Peralta Avenue. The remaining m $10 million to complete the Route will <br />come from other sources; i.e., local assessment districts, thus providing <br />leveraging for the sales tax funds. The project is contingent upon receipt of <br />the $M} UQ million. If it is not forthcoming, the project will not be built. (2) <br /> <br />Note (2) <br /> <br />Cost break-alii is asfollows: <br /> <br />A) <br /> <br />Rle. 238 HIlY",'lild Bypass 6ltlllefi'uwtlj/exp. ess,~'ay <br />(includes sale ttf exeetJS l'ig}tt of \-~ <br /> <br />70M <br /> <br />Bf A) Rte. 238 through Union City <br />Widelling existing Mission Blvd. to 6 lanes <br /> <br />15M <br /> <br />G7 B) Rle 84 - 4 lane freeway <br /> <br />55M <br /> <br />l# C) Engineering/Design <br /> <br />H7M <br /> <br />Total <br /> <br />-1M 77M <br /> <br />3 <br /> <br />Rev: July 28, 2005 <br />