My WebLink
|
Help
|
About
|
Sign Out
SR 05:277
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 4:19:46 PM
Creation date
9/29/2005 1:51:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/4/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />In April of 1990, the City Council approved the final PUD development plan for Laguna Oaks. <br />The project was developed in accordance with the adopted Laguna Oaks Specific Plan that <br />included substantial infrastructure improvements, including the construction of an additional <br />two-lane bridge across the Arroyo de la Laguna and road widening for Bernal Avenue. The <br />developer, The De Silva Group, was obligated to construct the new bridge. The original concept <br />for the bridge was to install an interim two-lane bridge south of the existing bridge to <br />accommodate all eastbound traffic, while the existing steel truss bridge was to handle one lane of <br />westbound traffic and a bicycle/pedestrian path. The ultimate improvement for Bernal Avenue <br />considered the removal of the old steel truss bridge and an expansion of the two-lane interim <br />bridge to a five lane bridge with complete pedestrian and bike paths on either side of the bridge. <br /> <br />In December of 1993, the City Council modified the bridge project and approved a new concrete <br />bridge with a false steel superstructure which would replicate the existing steel truss bridge for <br />eastbound traffic and retained the existing steel truss bridge for westbound traffic. <br /> <br />The construction of the bridge was dependant on obtaining right-of-way from the San Francisco <br />Water Department (SFWD). Rather than acquire the required right-of-way from SFWD and <br />proceed with the construction of the second bridge, the decision was made to wait for the SFWD <br />property to develop and require the developers of the property to dedicate the right-of-way to the <br />City. The bridge construction schedule did not move forward until 2000 when the development <br />agreement for the SFWD property was completed. The process of securing the necessary <br />environmental permits was begun, and the permits were obtained in 2002. Staff proceeded to <br />meet with the De Silva Group in Spring of 2003 to discuss the timing for construction of the <br />bridge. Given the overall length of the construction schedule, Staff decided to pursue the first <br />phase of construction, the removal of the old abutments for the Bernal Bridge in 2003, with the <br />De Silva Group to start construction on the new bridge in 2004. <br /> <br />Staff met in late May of 2004 with representatives of the De Silva Group to discuss the current <br />schedule for completion of the bridge. Staff was informed that construction would not start that <br />year because of funding. The De Silva Group was concerned with the high construction costs for <br />the new bridge, and the extent of their obligation to fund the construction. <br /> <br />The City Council was asked on August 3, 2004, to consider removal of the false steel <br />superstructure and redesign of the bridge in an effort to reduce costs, and to better complement <br />the existing historic steel bridge. The City Council directed staff to redesign the second Bernal <br />Bridge, eliminating the false steel superstructure, to proceed with moving the sidewalk on the <br />existing bridge next year (2005), and to bring the final design back to Council for approval. <br /> <br />SR:05:277 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.