Laserfiche WebLink
<br />FISCAL IMPACT <br />Construction of the facility and related improvements is expected to cost approximately <br />$290,00, including a construction contingency. Since the Council has allocated $400,000 <br />toward a public restroom project, this leaves $110,000 for any unknown field conditions that <br />may occur. All funds remaining at the conclusion of the project could be allocated to other CIP <br />projects, or used for another public restroom project. <br />Based on preliminary estimates by the Support Services Division, it is anticipated that <br />approximately $4,600 in annual maintenance costs will be required to regularly service and <br />maintain the proposed structure. In addition, an annual replacement fee equaling approximately <br />2% of the buildings' initial construction cost should be set aside for the long-term maintenance <br />or replacement of the facility. This project is not expected to have any cost impacts on Parks <br />Maintenance Division staff. <br />Respectfully submitted, ).1/ <br />J:a:~c ~~r~ <br /> Susan Rossi Nelson Fialho <br />Director of Parks and Director of Finance City Manager <br />Community Services <br />Attachments: I. Traditional "Railroad-style" Design Schematic <br /> 2. Contemporary Design Schematic <br />SR 05:256 <br />Page 3 <br />