My WebLink
|
Help
|
About
|
Sign Out
SR 05:259
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2005 12:13:11 PM
Creation date
9/15/2005 4:27:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />19. The storm drain lines in Parcel D shall be located entirely within Parcel D. Iffound <br />infeasible by the City Engineer, these lines shall be placed in easements with the <br />maintenance obligation being the owners' association. <br /> <br />20. The ownership and maintenance responsibilities of the 36" storm drain line located <br />outside "B" Street, the inlet to this line, and headwall shall be determined in <br />conjunction with the review and approval ofthe final map. If ownership/maintenance <br />is placed with either the City or owners' association, appropriate easements and <br />accessshallbeincorporated_U11QJhepll!Il.Q",nersilill/maintenance may be left with <br />the owner of the Berlogar property as an alternative. --- ------- <br /> <br />21. The utilities in "B" Street shall be extended to its terminus unless otherwise approved <br />by the City Engineer. <br /> <br />22. The value of the heritage trees as shown in the September 5, 2002 letter from Ralph <br />Osterling Consultants, Inc. ($28,020) shall be paid to the City's Urban Forestry Fund <br />at the time of recordation of the final map. <br /> <br />23. When the developer of the Chrisman property extends the water line providing City <br />water to the Chrisman residence, the developer shall extend the water line from the <br />Chrisman driveway to the Brozosky property line within the EVA area shown on the <br />tentative map. The size of the water line shall be the same as the size of the water line <br />that serves the Chrisman residence. The developer of the Chrisman property shall <br />also pay for and install at the edge of but within the Brozosky property a 5/8-inch <br />water meter, which meter shall serve the Brozosky property only. Payment includes <br />the standard connection fees for such meter. Prior to the installation of the water line <br />to the Brozosky property, and prior to the installation of the meter, the Brozoskys may <br />increase the size of the water line and/or the meter at their own expense. The <br />Brozoskys may connect to the meter. Use of this water line shall be on an interim <br />basis and shall be discontinued at such time as the Brozosky property is connected to <br />the City water system under the Vineyard A venue Corridor Specific Plan. This <br />condition may also be satisfied by a separate agreement signed by the <br />ChrismanslBrozoskys. <br /> <br />24. Unless otherwise approved by the Fire Marshal, no housing construction shall begin <br />until such time as an acceptable emergency vehicle access has been established, as <br />defined by the Fire Marshal. This access shall be maintained at all times until the <br />public improvements are accepted. <br /> <br />25. All utility boxes and transformers for this project shall be installed underground. All <br />capacitor banks or switches for the project may be installed above ground if properly <br /> <br />Tract 7399. Northstar Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.