Laserfiche WebLink
132. The storm drainage from each lot shall be directed to the street or a approved <br /> storm drain system unless otherwise approved by the Building official and City <br /> Engineer. <br /> <br />133. The applicants engineer shall verify the capacity of the storm drain swale along the <br /> northerly property line and the existing pipes under Foothill Road are adequate to <br /> handle the storm drain run-off. The applicant shall mitigate any storm drain <br /> problems associated with this development to the satisfaction of the City Engineer. <br /> The existing CMP storm drain pipes under Foothill Road shall be replaced with <br /> RCP pipes. <br /> <br />134. The owners of the lots 3, 4, 6, and 7 shall be notified that they will have accept a <br /> portion of the drainage from the uphill area as part of their individual lot drainage <br /> plan. Specific reference to these requirements shall be made in the deed for each <br /> lot. <br /> <br />135. The applicant shall improve Foothill Road across the project frontage to the <br /> satisfaction of the City Engineer. These improvements shall essentially as shown <br /> on the improvement/striping plan for Foothill Road. Except the bike lane shall be <br /> maintained along the total westerly frontage and road shall transition southerly of <br /> the project frontage. The applicant shall dedicate a 8 foot wide public service <br /> easement behind the curb. There should be no driveway access to Foothill Road. <br /> The final map shall reflect this condition. The developer shall determine the <br /> structural section of existing west side of Foothill Road. If the existing street <br /> section is not adequate for the anticipated traffic demand the street shall be <br /> reconstructed. If the street section is adequate the street shall be overlayed with a <br /> minimum of 2 inches of asphalt with fabric. The tentative map shall show these <br /> improvements. <br /> <br />136. The developer shall be responsible for the undergrounding of the overhead utility <br /> lines across the project Foothill Road frontage. The applicant may enter into a <br /> reimbursement agreement with the City to recover some of the cost of the <br /> undergrounding from other benefiting properties when they develop their <br /> properties. <br /> <br />137. All proposed V-Ditches shall be constructed of concrete and colored with an <br /> earthtone color approved by the Planning Director. <br /> <br /> Page 23 <br /> <br /> <br />