Laserfiche WebLink
systems. The developer shall receive credit towards their pro rata share of specific <br /> plan fees for any improvements to Vineyard Avenue which have been identified as a <br /> cost to be shared by all properties in the Plan area. <br /> <br />52. The developer shall install a 6 ft. wide sidewalk from the terminus of the existing <br /> sidewalk at Montevino Drive to the east end of the Lutz property (PUD-99-10), <br /> including retaining walls as necessary and as specified in the Vineyard Avenue <br /> Corridor Specific Plan. The final design of this sidewalk shall be submitted for the <br /> review and approval by the Planning Director prior to the recordation of the final <br /> map. The developer shall receive credit towards their pro rata share of shared <br /> improvements in the Plan Area for the installation of this sidewalk. <br /> <br />53. The developer shall construct a center median with landscaping and automatic <br /> irrigation in Vineyard Avenue in the general area of the Gooch (PUD-99-8) and Lutz <br /> (PUD-99-10) properties. The final design of this median and landscaping shall be <br /> submitted for the review and approval by the Planning Director and City Engineer <br /> prior to the recordation of the final map. <br /> <br />54. The developer shall be responsible for constructing a 12 It. wide paved access along <br /> the proposed sewer and water lines between their connection with Foxbrough Estates <br /> (at the rear lot line of Lot 10, Tract 5188) and the proposed EVA for use by City <br /> maintenance crews. This access will be maintained by the City but may also be used <br /> by the project's homeowners association to transport equipment necessary to perform <br /> maintenance for the open space area on the south end of the McGuire property (PUD- <br /> 99-6). The final location and design of this maintenance road, with access-restricting <br /> barriers at either end, shall be submitted for the review and approval of the City <br /> Engineer prior to the recordation of the final map. An open offer of dedication to the <br /> City shall be made for the small triangular comer of Parcel B containing the sanitary <br /> sewer and storm drain easements, and 12 It. wide paved sewer maintenance access. <br /> The developer shall be reimbursed by the City for the design and installation of this <br /> maintenance road and the 8" water and sanitary sewer mains from the end of Lot 10, <br /> Tract 5188 to Vineyard Avenue. <br /> <br />55. The developer shall be responsible for the installation of off-site improvements for a <br /> new 15-inch sanitary sewer trunk main between Tioga Court and the southwest corner <br /> of Lot 8 of the Vineyard Avenue Corridor Specific Plan. The developer shall receive <br /> credit towards their pro rata share of shared improvements in the Plan Area for the <br /> installation of this main. In the event that the replacement of an 8-inch sewer trunk <br /> main with a 15-inch main from Bemal Avenue to Tioga Court is not complete prior to <br /> the issuance of a grading permit for this development, the developer shall be <br /> responsible for the installation of this main. The installation of both these trunk mains <br /> shall be completed prior to the issuance of a building permit for the homes. The <br /> <br /> Page 11 <br /> <br /> <br />