My WebLink
|
Help
|
About
|
Sign Out
ORD 1788
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:24 PM
Creation date
11/17/1999 10:23:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1788
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and ' <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> <br /> c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace liltcr materials to ensure ett~ctivcncss and to prevent street <br /> flooding. <br /> <br /> d. Create a contained and covered area on the site for the storage of bags, <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br /> that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br /> concrete/plaster operations do not discharge wash water into street, gutters, <br /> or storm drains. <br /> <br />70. The applicant shall construct the proposed private street as shown on the PUD <br /> plans. The applicant shall obtain the necessary easement right to construct the road <br /> on the Bach property prior to the approval of the final map for this project. The <br /> grant deed for the EVA, PSE, and PAE from the Bach's shall be recorded prior <br /> to/concurrently with the Parcel map. <br /> <br />71. Access to the proposed parcels shall be from the new private road (lots 2,3 & 4) <br /> and from the existing Sycamore Road (lot 1). No access shall be allowed from the <br /> new east/west street. <br /> <br />72. The typical section for the private road shall be modified to show the PSE <br /> extending to the 6 foot wire mesh fence location. <br /> <br />PUD-99-02 City Council - Conditions of Approval Page 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.